Loading...
ST9902-CS060928 I CH'"lUr 'H--il L ' it..rt'. ll.~ t-?-;I.,t. t14- V1.L. ~~ TEAGUE NALL AND PERKINS iJIIJINc ENGINEERS. SURVEYORS . CONSULTANTS Mel11orandul11 To: Lance Smith From: Matt Atkins, P E cc: Larry Davis, Keith Marvin, P E Date: 9-28-06 Re: West Sandy Lake Road -Request for Change Order We have received and reviewed the requests for change orders regarding several areas for the above referenced proJect. and have the following comments. ~ The request for $897 60 for the concrete steps and lead walk on Branchwood appears to be consistent with the anginal bid prices and consistent with the work ~ormed ~The submitted cost of $1 ;-00 00 to remove the excess concrete from the power poles has been acknowledged However, due to ongoing communication with TXU regarding this Issue, this work cannot be authorized at this time It IS anticipated that a decision will be made regarding this issue as soon as possible 0The request totalIng $1,835.00 referenr.ing an existing concrete apron does not Indicate a location Assuming the request IS for the inlet that was constructed on the southwest comer of Royal Lane and Sandy Lake Road, It IS our opinion that the Inlet was not constQ!cted according to the plans Theretore, the apron should be reconstructed at the Contractor's sole expense Including any remobillzatloll If requested, conSideration may be given to not replacing all of the apron The City has requested a cost for the addItional retaini?t walls needed adjacent to the trails and sidewalks It i"s anticipdted that this cost would e less than the price bid for the retaining walls Originally planned for the project. If at all pOSSible, this cost should be Included in one change order to be Included with the sidewalk steps Please let me know if you have a estlons i'Z1~q (Il vL 121 bO r,orth Au, afT'S Road. Dattas Tex(l~ 75243.214 A61 9867 phlnP . 214 461 9864 fax \oVWW tnp-oniine COIn PAVING COMPANY 419 East Highway 80 PO Box 270040 Dallas. Texas 75227-0040 Tel (972) 289-0723 Fax (972) 216-5637 September 27, 2006 City of Coppell 255 Parkway Coppell, Texas 78019 Attn: Larry DavIs Reo West Sandy Lake Road ST 99-02A Request for Change Order Mr Davis please reVIew the following pnces submitted for additional work on the West Sandy Lake Road project. INST ALL NEW CONCRETE APRON 1 LS @ 93500 1 LS @ 900.00 REMOVE & DISPOSE OF EXISTING CONCRETE APRON: A remobIlization charge may be required if installation of apron is done at a later time. If you need any additional informatIOn you may call me at 972-289-0723 Sincerely i~~ Lance SmIth Project Admimstrator 4IJ /fl V I~.d~~ E~t4JIid," 1974 PAVING COMPANY 419 East Highway 80 PO Box 270040 Dallas, Texas 75227-0040 Tel (972) 289-0723 Fax (972) 216-5637 September 25,2006 CIty of Coppell 255 Parkway Coppell, Texas 78019 Attn. Larry DavIs Re West Sandy Lake Road ST 99-02A Request for Change Order Mr DavIs please reVIew the follOWIng pnces submItted for additIOnal work on the West Sandy Lake Road proJect. Concrete steps for lead walk on Branchwood - 46 SF @ 19.50 = $ 897 00 Remove excess concrete from eXIstIng power pole foundatIOn to allow passage of concrete traIl - 2 EA @ 750.00 = 1,500 00 If you need any addItIOnal InfOrmatIOn you may call me at 972-289-0723 SIncerely i~/~ Lance SmIth Project AdmInIstrator fi~ ~. ~ I IfJ#I 1'~ 1I fJ/. t E4taltt"aid '974