TR0301-CS060810
August 10, 2006
CIty of Coppell
Engineering Department
Attn. Mr Marvin
Via Fax: 972-304-3570
,/ /
Re. TR03-01A ,TR03-01B -' r/ I <-
Traffic Signal Installation @MacArthur/Beltline &
Bethel School Road
Dear Mr. Marvin
This letter is for the extra work for sidewalk installation and extra video camera and
processor unit which IS reqUIred for Belt Line and McArthue.
The price of sidewalk is $ 6.35 per Sqft at the intersection of Bethel School road.
The extra camera price is $3200.00 and processor unit IS $ 1275.00, Every 4 camera takes
one processor m this case we are using 5 camera for this intersection, therefore one
additional processor is required to be installed in the cabinet.
Please call me for any addItional mformation you may need.