Loading...
ST9902-CS061009 - '.'-c "':.J ,~ 5"'1 11'1 l'-"~JCJTJ"=' 'l_J 1 I (", t-e~Klr!S w144i::>1-J(ji::;Lj , ., !f!I!!!f:::fj TEAGUE NALL AND PERKINS UIU/NC ENGINEERS. SURVEYORS . CONSULTANTS Memorandum To: Lance Smith, John Gay From: Matt Atkins, P E cc: Larry Davis, Keith Marvin, P E Date: 10-9-06 Re: West Sandy Lake Road -Stamped Concrete Median Noses Due to the change in the standards during the design of the construction plans, the median noses were not accurately reflected In the plans To c1anfy the requirements for the median noses, the standard nose for West Sandy Lake Road shall be a seven (7) foot long thickened median nose followed by 17 feet of stamped concrete This will allow a hard surface at each median nose for a distance of 24 feet from the tiP of each median nose All condUits shall be extended to beyond these p61nts to allow for access Please feel free to call with any question or comments ri/~ d 10 # ,,,~~ '12160 North Abrams Road. Dallas, Texas 75243.214461 9867 phone. 214 461 9864 fax ww\v tnp.online com