Loading...
All Care-CS060803 THE C I T Y o F corrELL ,.'~~~.~~~~~ c~,~gh~.>r 1',",--'-'_, ." . ,,__ ,-<:;.r' Cl r ..... -'~~. '-"'~, ~,,-"""- , ...",...,/" ",,"r q -\' "\ ,~y \ ;) August 3,2006 Steve Homeyer, P E Homeyer EngIneenng POBox 294527 Lewlsvllle, TX 75029 RE: All Care Vetennary Hospital, Lot I, Block A Fee Assessment Letter Dear Mr Homeyer Enclosed IS a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculatIOns for the referenced development. Please make payment for the Impact Fees to the City of Coppelllll the amount of $4,757.90 and forward to the EngIneerIng Department along with a copy of the Fee Assessment table ThiS amount IS a portIOn of the assessed fees that need to be paid pnor to fillllg of the final plat Please note that the Texas Legislature, under Senate BIll 243, delayed the collectIOn of Water and Sewer Impact Fees untIl the Issuance of a BuIldIng Perrmt Please provide a copy of the EngIneer's estImate or contract to our office so the 2% & 4% constructIOn InspectIOn fee can be venfied The constructIOn InspectIOn fees must be paid pnor to the scheduled pre-constructIon meetmg The additIonal fees for water and sewer taps, water meters, and utIlIty InspectIOn fees need to be paid by separate check at the ne\\< PublIc Works Service Center, 816 S Coppel! Road Meters wlll be ordered when those fees are paid Appropnate payment of the reqUIred fees w1l1 help Insure a successful begInnmg of thIS project We look forward to workIng with you on thiS project If you have any questIOns, please contact me S Incerel y, " ; , -.-------------"" .~<_. "-.------- Keith R MarvIn, P E ASSistant City Engmeer cc Jenmfer Armstrong, FInance DIrector Mary Beth Spletzer, Admmlstratlve Secretary, BUIldIng InspectIOns Glenn Hollowell, ASSistant Director of PublIc Works Greg Jones, Chief BuIldIng OffiCial Brad Reid, Director of Parks and RecreatIOn 2:5 PARKWAY * PO sex 9478 * COPPLLI.. TX 'snl9 * TLl_ 972/462 Ou22 * FAX 972/304 3673 ,-..... ~ r ~VELOPMENT FEE TAB: : Project: All Care Veterinary HospitaL, Lot 1, BLock A Date: 8/3/2006 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $000 (100% due at Issuance of BUIldIng PermIt) Water Tap InspectIOn Fee $000 (lOO% due at Issuance of Water Meter) Water Meter Fee (DomestIc) $000 (lOO% due at Issuance of Water Meter) Water Meter Fee (IrngatIOn/Firehne) $000 (lOO% due at Issuance of Water Meter) Water Meter DeposIt (DomestIc) $000 (100% due at Issuance of Water Meter) IrngatIOn/Flrehne Meter Deposlt $000 (lOO% due at Issuance of Water Meter) Wastewater Impact Fee $000 (lOO% due at Issuance of BUIldIng PermIt) Wastewater Tap InspectIOn Fee $000 (100% due at Issuance of BUIldIng PermIt) UtIhty FInal InspectIon Fee $000 (lOO% due at Issuance of BUIldIng PermIt) Park Fee $000 $000 (100% due pnor to FIlIng Plat) Roadway Impact Fee $4,75790 $4,75790 (100% due pnor to FIlIng Plat) Street LIght Fee InformatIOn not A vmlable (100% due pnor to Acceptance of Project) II Street SIgn Fee InformatIOn not A vmlable (100% due pnor to Acceptance of ProJect) II ConstructIOn InspectIOn Fee InformatIon not A vallable (lOO% due pnor to Start of ConstructIOn) ITOT AL ~ $4,75790 I TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $4,757 90 D~ELOPMENT FEE WORKSHE~ PROJECT: DATE: All Care Veterinary Hospital, Lot 1, Block A 8/3/2006 Water Impact Fee: Domestic Meter(s) 0 = 0 ESU's Irrigation Meter(s) 0 = 0 ESU's 0 = 0 ESU's Fireline Meter(s) 0 = 0 ESU's Total #. o ESU's @ $900 00 ea (Due prior to issuance of building permit) $000 Water Tap Inspection Fee: Total #. o Connections @ $50 00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) $000 Domestic Water Meter Fee: Total #. 0 Domestic Meter(s) @ $000 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) $000 IrrigationlFireline Water Meter Fee: Total #. 0 Irrigation Meter(s) @ Total #. 0 Additional Irrigation Meter(s) @ Total #. 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $000 $000 $000 $000 $000 $000 Domestic Water Meter Deposit Fee: Total #. 0 Meter(s) @ $30 00 ea. (100% due prior to issuance of water meters) $000 IrrigationlFire Meter Deposit Fee: Total #. 0 Meter(s) @ $30 00 ea (100% due prior to issuance of water meters) $000 Wastewater Impact Fee: Total Domestic Meters ESU's. 0 @ $90000 ea (Due prior to issuance of building permit) $000 Wastewater Tap Inspection Fee: Total #. 0 Connections @ $50 00 ea. (100% due prior to issuance of building permit) $000 Utility Final Inspection Fee (All developments): Total #. 0 Lots @ $50 00 ea. (100% due prior to issuance of building permit) $000 Park Fee (For Residential Developments Only): Page 1 0- fELOPMENT FEE WORKSHf-r * Preliminary plat approved: o o Single-family @ $0 00 per lot Multi-family @ $0 00 per unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way This fee cannot be assessed until after T U Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 $000 $000 $4,757 90 Information not Available Information not Available Information not Available ROA r-y A Y IMPACT FEE CALCUL) -ONS PROJECT: DATE: All Care Veterinary Hospital, Lot 1, Block A 8/3/2006 ROADWAY IMPACT FEE: 1 Office Medical/Dental Office 1,776 1 78 ]7.86 $150 $4,757.90 * (Figure 4 ] - Roadway Impact Fee Study) ** (Table 410 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - The Master Fee Schedule) ~... . A~(JJJ.&ttHJE,' . . Ji'h1$1.QOI