Loading...
ST0502B-CS061002 Page 1 of 1 Paula Crocker - Re: Freeport Parkway--Callejo Property (Project ST 05-02D) From: To: Date: Subject: CC: Ken Gnffin June Lykes 10/212006 10 13 AM ' Re Freeport Parkway--Callejo Property (Project ST 05-02BY Paula Crocker '-- ---- Mr Lykes Weare stIll workmg to de-federalIze the grant for a portIOn of Freeport Parkway The earlIest tIme lme for that effort IS the first quarter of2007 We have already spoken WIth an Engmeenng firm but untIl we finalIst the de-federalIzatIOn of the money, we do not want to proceed WIth a deSIgn contract. DesIgmng and constructmg thIS street as a federal project wIll mcrease the cost of deSIgn and constructIon. Ken Gnffin, P E DIrector of Engmeenng/Pubhc Works 972-304-3686 kgn ffin@Jcl.copndl.J~,us >>> "June Lykes" <]elykes@ao1.com> 9/2612006 11 51 AM >>> Sept. 26 At one time we talked about the City de-federalizing the extension of Freeport Parkway through the subject property Will you please give me an update on the progress being made Also, do you have a schedule for the construction of this facility I appreciate you attention to this matter Please give me an e-mail reply Thanks JEL J E Lykes 3245 FM 184 Gatesville, TX 76528 Tele 254 487 3062 Fax: 254487.2082 Cell 254.2890804 jelykes@c:lol.Gom file.! /C \Documents%20and%20Settmgs\PCROCKER\Local%20Settmgs\ T emp\GW} 0000 10/2/2006