ST0502B-CS061002
Page 1 of 1
Paula Crocker - Re: Freeport Parkway--Callejo Property (Project ST 05-02D)
From:
To:
Date:
Subject:
CC:
Ken Gnffin
June Lykes
10/212006 10 13 AM '
Re Freeport Parkway--Callejo Property (Project ST 05-02BY
Paula Crocker '--
----
Mr Lykes
Weare stIll workmg to de-federalIze the grant for a portIOn of Freeport Parkway The earlIest tIme lme
for that effort IS the first quarter of2007 We have already spoken WIth an Engmeenng firm but untIl
we finalIst the de-federalIzatIOn of the money, we do not want to proceed WIth a deSIgn contract.
DesIgmng and constructmg thIS street as a federal project wIll mcrease the cost of deSIgn and
constructIon.
Ken Gnffin, P E
DIrector of Engmeenng/Pubhc Works
972-304-3686
kgn ffin@Jcl.copndl.J~,us
>>> "June Lykes" <]elykes@ao1.com> 9/2612006 11 51 AM >>>
Sept. 26
At one time we talked about the City de-federalizing the extension of Freeport Parkway through the subject
property Will you please give me an update on the progress being made Also, do you have a schedule for the
construction of this facility
I appreciate you attention to this matter Please give me an e-mail reply Thanks JEL
J E Lykes
3245 FM 184
Gatesville, TX 76528
Tele 254 487 3062
Fax: 254487.2082
Cell 254.2890804
jelykes@c:lol.Gom
file.! /C \Documents%20and%20Settmgs\PCROCKER\Local%20Settmgs\ T emp\GW} 0000
10/2/2006