Loading...
ST9905-CS061005Suzan Taylor - Re Bass Pro/V1! Bethel Road Page 1 From: "Lorna Gibson" <LGibson@ci.grapevine tx.us> To: "Suzan Taylor" <staylor~ci.coppell.tx.us> Date: 10/5/2006 2:15 39 PM Subject: Re: Bass Pro/V11 Bethel Road We are still working with the contractor over the cost of the bridge. We are meeting with them next week. I can let you know more at that time. Thanks and have a great weekend »> "Sii~an Taylor" <stavlorC~ci.conoell.tx.us> 9/22/2006 8:22 AM »> Lorna: I just wanted to check and see if everything is proceeding okay with Bass Pro -you had some concerns about the cost of the bridge. We are planning on taking the construction award to one of the October city councils. I drove by the project yesterday and saw that TXU had moved the poles to the north and is re-stringing the wires. We do not have their permit or plans for the underground portion of the relocations. There is another utility on the poles and I am not sure who it is - it may be Verizon I am not sure if Verizon ever got the key to DFW and we do not have a permit from Atmos on their relocations. Suzan BEGIN-ANTISPAM-VOTING-LINKS Teach Canlt if this mail (ID 1887604) is spam. Spam maililter ci.grapevine.tx.us/b php?c=s8i=1887604&m=eaf19ed95ae9 Not spam. maililter ci.grapevine.tx.us/b php?c=n&i=1887604&m=eaf19ed95ae9 Forget vote: maililter ci.grapevine.tx.us/b.php?c=f8i=1887604&m=eaf19ed95ae9 END-ANTISPAM-VOTING-LINKS