Loading...
ST9905-CS060817Suz'_n Taylor - Re: Bass Pro Page 1 From: "Lorna Gibson" <LGibson@ci.grapevine.tx.us> To: "Suzan Taylor" <staylor@ci.coppell tx.us> Date: 8/17/2006 9'37 53 AM Subject: Re' Bass Pro Thanks. Stan has a concern with the split for mobilization. The description of pay item shows 5% of total amount bid. He would like that to reflect 5% for the total amount for Grapevine and the 5% total ~~~ C.l.( ~ bid for Coppell. This would be the only bid item that would be lump sum, which would not identical. Please let me know how you feel amount that. Thanks »> "Suzan Taylor" <staylor@ci.coppell.tx.us> 8/16/2006 3 46 PM »> We are okay with the 80/20 split. It will need to be changed in the addendum »> "Lorna Gibson" <LGibson@ci.grapevine.tx.us> 8/16/2006 1 52 PM »> Can I please get a copy of your median nose details. I see where it is shown on the landscape plans, but I did not see a detail. insurance requirements. I think that I may have had this atone time, but I cannot recreate it now Overtime pay rate. Is it by inspector or is it a set rate. We charge $25/hour Also we were looking at the lump sum % splits. TranSystems said that the 75/25 breakdown was done towards the start of the project. Looking at the project lengths and costs, it looks like it is closer to 80/20 We wanted to check with Coppell before we had TranSystems make any changes. Please let us know if Ken has a concern with the change It looks like Stan is here the rest of the afternoon and tomorrow if he needs to get in contact with him Stan's number is (817) 410-4135 Thanks BEGIN-ANTISPAM-VOTING-LINKS Teach Canlt if this mail (ID 1779968) is spam: Spam. maililter ci.grapevine tx.us/b php?c=s&i=1779968&m=8cbe7fb4c9aa Not spam. maililter ci.grapevine.tx.us/b php?c=n&i=1779968&m=8cbe7fb4c9aa Forget vote. Suzan Tgylor - Re. Bass Pro From: "Lorna Gibson" <LGibson@ci.grapevine tx.us> To: "Suzan Taylor" <staylor@ci.coppell.tx.us> Date: 8/17/2006 8 32:40 AM Subject: Re. Bass Pro Page 1 S~ ~` ~` -D 1747 LF and 2,000,000 is the engineers est. That is rounded up from something closer to 1 8 Thanks »> "Suzan Taylor" <staylor@ci coppell.tx.us> 8/16/2006 2:35 PM »> Lorna: The median nose details are attached We use the NCTCOG insurance requirements Our overtime pay rate is $54/hour I gave the fourth question to Ken. What is the length and estimated cost of your project, in case he asks. »> "Lorna Gibson" <LGibson@ci.grapevine.tx.us> 8/16/2006 1 52 PM »> Can I please get a copy of your median nose details. I see where it is shown on the landscape plans, but I did not see a detail. insurance requirements. I think that I may have had this atone time, but I cannot recreate it now Overtime pay rate. Is it by inspector or is it a set rate We charge $25/hour Also we were looking at the lump sum % splits. TranSystems said that the 75/25 breakdown was done towards the start of the project. Looking at the project lengths and costs, it looks like it is closer to 80/20 We wanted to check with Coppell before we had TranSystems make any changes. Please let us know if Ken has a concern with the change. It looks like Stan is here the rest of the afternoon and tomorrow if he needs to get in contact with him. Stan's number is (817) 410-4135 Thanks