Loading...
ST9905-CS060816Suzan Taylor - FW~ addendum #1 for Bethel Rd. Page 1 From: <gdkraus@transystems.com> To: <jcmasterson@transystems.com>, <staylor@ci coppell.tx.us>, <Igibson@ci.grapevine.tx.us> Date: 8/16/2006 2:0839 PM Subject: FW~ addendum #1 for Bethel Rd. OK folks. Here is the addendum as I currently understand it. Please give me you input and we will revise and send out. As I recall the procedure we will fax it to all on the list and let them know they can pick up copies of the revised/added plan sheets at the city of Coppell. - .. From: DL-Traci Lawless Sent: Wednesday, August 16, 2006 1 40 PM To DL-Garry Kraus Subject: addendum #1 for Bethel Rd. Traci Lawless Office/LAN Administrator TranSystems Main 972-280-9300 ext. 32533 Suzan Taylor -Addendum One doc Page 1 BID PROPOSAL ADDENDA NO. 1 ADDENDUM NO: ONE PROJECT NAME: BETHEL ROAD I ST 99-05 Bid No. Q 0806-O1 Bass Pro Drive LOCATION COPPELL, TEXAS GRAPEVINE, TEXAS ISSUED BY City of Coppell City of Grapevine ISSUE DATE: August 15, 2006 BID DATE: August 24, 2006 1 This addendum modifies and extends the requirements of the plans and construction specifications for the above referenced project. 2. Staple these addenda to the inside of the rear cover of the construction specifications or bind it into the construction specifications at the end of the Bid Proposal. 3 Note receipt of all addenda on the Bid Form located in the Bidding Documents, and also on the outside cover of the envelope containing the Bid Documents. CONSTRUCTION SPECIFICATIONS Item No. 1 Page 1-34 Bid Item "I-94-B" should read "I-94-CB" Item No. 2 Page 1-37 Bid Item "I-113-CA" should read "I-113-CB" ~ _._, `/ Page 5-3-I ~- _ ~ ection 2.92 "Pay Item #I-113-CA" should read "Pay Item #I-113-CB" / Item No. 3 Page 5-15 J ~ ` ~ ~~ r ' Page 1 of 6 ~hQ. m~~-1gd~tau~t d~~ ~5 a~an(~ ~~Q ~~E~,dv, -f~ ~vn~O~~~c~ c~a~u,~Q Sec~~on ~ -Chis ~~ra ~~c~uc4uv ~~- ~%~r~~~,r, -~~ oU~~nc~.Q ~v~BVcavs~{ c~~ u ~ Sty ~tf~5 t~ ~~j ~~~ ~ ~~ Suzan Taylor -Addendum One doc Page 2 Section 2.38 "Pay Item #I-51-CA" should read "Pay Item #I-51-CB" '~ Item No. 4 Page 5-16 Section 2.40 "Pay Item #I-53-CA" should read "Pay Item #I-53-CB" '~ Item No. 5 Page 5-19 Section 2.52 "Pay Items #I-65, 66, & 67-CA" should read "Pay Items #1-65, 66 & 67- CB" Item No. 6 Page 5-26 Section 2.74 "Pay Item #I-94-CA" should read "Pay Item #I-94-CB" / Item No. 7 Add: There will be a separate Bonus and Penalty associated strictly with the closure of Bethel Road. At the August 8, 2006 City Council meeting, Council authorized the closure of Bethel Road for a period of time to allow for the construction of a cast in place multi-box culvert beneath Bethel Road and the lowering of the 16" water lme and the adjustment of the 12" sanitary sewer line, and for other items generally associated with Pay Items 1-51-CB, 1-53- CB, 1-55-CB, 1-56-CB, 1-57-CB, 1-58-CB, 1 59-CB, 1-65-CB, 1-66-CB, 1-67-CB, 1-74- CB, 1-94-CB ~ 1-113-CB,, ~ I - 114CS3 ,~ To facilitate the construction of the box culverts and other necessary work, the City of Coppell will allow the closure of Bethel Road for a period of 45 calendar days. The closure should generally take place in the time period of February 2007 to May 2007 The City of Coppell will provide a $2,000 /day bonus for every day before 45 calendar days that Bethel Road is opened back up to two way traffic (i.e. if opened back up in 40 days there will be a $10,000 bonus given). The City of Coppell will assess a $2,000 /day penalty for every day beyond 45 calendar days that Bethel Road is closed to accomplish the necessary work (i.e. if closed for 48 days there will be a $6,000 penalty assessed). NOTE. The maximum allowable bonus is capped at $30,000; however, the penalty assessed for keying Bethel Road closed beyond 45 days is unlimited. As part of the allowed closure, the successful low bidder will be required to provide detour signage to direct traffic as follows 1) Eastbound -south on Freeport Parkway, east on Burns, and north on Coppell Rd. back to Bethel Road, and 2) Westbound -south on Coppell Rd., west on Burns, and north on Freeport Parkway back to Bethel Road. Page 2 of 6 Suzan Taylor -Addendum One doc Page 3 In addition to the appropriate detour signage, the successful low bidder will also be required to provide a directional sign on eastbound Bethel Road, near its intersection with Freeport Parkway that lists the downtown businesses. This sign will generally be located in close proximity to the initial detour sign for eastbound traffic on Freeport Parkway There will no additional compensation for any additional detour signs associated with the closure of Bethel Road. Any additional cost associated wit the detour signs or the business signs shall be considered subsidiary to the above liste 13 id items associated the CB bid items. 4 Item No. 8 Page 1-31 Bid Item Item No. 9 Page 1-31 Bid Item Item No. 10 Page 1-37 Bid Item "I-77-CA" Quantity should be "90 LF" " "I-78-CA" quantity should be"77 LF" "I-114-CB" shall be added as ~/ Item No Quantity Unit Description and Unit Price in Words Unit Price Total Price I-114-CB 5100 CY Channel Excavation, Complete In Place Dollars and Cents per CUBIC YARD Page 5-37 Pay Item I-114-CB shall be added as. / "Section 2.93 Pay Item #I-114-CB -Channel Excavation This pay item shall consist of all work necessary to excavate and where necessary place for tributary G-1 from Sta 26+10 to Sta 34+00, including proper disposal of excess material. Payment shall be made on the basis of net in place fill in accordance with plans and cross sections. Payment for gabion structures is not included in this bed item. Payment for mitigation plantings along Tributary G-1 is not included in this bid item." Payment shall be made on the basis of price bid per cubic yard (CY) and shall be total Page 3 of 6 Suzan Taglor -Addendum One doc Page 4 compensation for furnishing all materials, tools, equipment, labor and any other incidentals necessary to complete the work." Item No. 11 Page 1-12 ` Section 15 Submission of Bids The following shall be added. "Contractor shall be required to provide one bid bond covering the total amount bid for both Bethel Road and Bass Pro Drive." ~ Item No. 12 Page 1-10 ,. Section 8 Contract Time The following shall be added under 8 1 "Contractor to provide one schedule covering both projects. Projects are to be done / concurrently and the calendar days bid shall apply to the overall project completion." Item No. 13 Page 1-16 Section 30 Testing Requirements The following shall be added. "The cities of Coppell and Grapevine shall hire one materials testing firm to complete all testing as required by the plans and specifications in both cities." ~/ Item No. 14 Page 5-30 Section 2 82 Pay Item #1-103-CA City Entrance/Monument Sign The following shall be added "Full size plans for the City Entrance Sign are available for review at the Engineering Department, City of Coppell, 255 Parkway Blvd., Coppell, Texas 75019 " ~ _ Item No. 15 Page 1-37 Change Summary to Page 4 of 6 ,;, ~., ~~ ~ ~ ` ~ ~ x, ~ 5 . ~/ Suzan Tag~lor -Addendum One doc Page 5 ll~ "TOTAL CA BID ITEMS BASE BID I-1-CA thru I-1~CA" And "TOTAL CB BID ITEMS BASE BID I-51-CB thru I-11~CB" /+ 4 V Page 5 of 6 Suzan Taylor -Addendum One doc Page 6 Item No. 16 Page 1-38 Change BID summary to "TOTAL BID ITEMS BASE BID I-1-CA thru I-11CA I-51-CB thru I-11 ~ CB" / Item No. 17 Page 1-40 L~-- Bid Item "I-13-G" should read "I-13-CA" "I-14-CA" should read I-14-G" -~ Item No. 18 Page 1-41 Bid Item "I-16-CA" should read "I-16-G" ~ Item No. 19 Page 1-52 Bid Item "I-86-CA & I-87-CA" should read "NA" under Unit Price and Total Price ~ Item No. 20 Page 1-53 Bid Item "I-94-B" should read "I-94-CB" ~ / Item No. 21 Page 1-56 ~ ~ ~ T-~i3-C ~ ~~ JVI~ Bid Item "I-113-CA" should read "~' under Unit Price and Total Price Item No. 22 Page 1-10 Section 7 Interpretations and Addenda The following shall be added under 7 1 "No questions shall be answered after 10.00 am on Monday August 21, 2006" ~ CONSTRUCTION PLANS Item No. 1 Bethel Road Sheet 63B Box Culverts P & P The following note shall be added to the plan view of the box culverts at the Bethel Road crossing: "Proposed water main lowering to clear proposed 4-6' x 10' box culverts per City of ~ Coppell std. detail 4200" Page 6 of 6 Suzan Taylor -Addendum One doc Page 7 Item No. 2 Bethel Road Sheet 63G Gabion Wall Details Add sheet 63G -Gabion Wall Details to the Bethel Road Plans Bethel Road Sheet 63A Box Culverts P & P Change drawing reference at four storm drainage connection points from "Sheet 84" to "Sheet 63G" Page 7 of 6