Loading...
ST9905-CS060802--- Suzan Taylor -_RE. W Bethel Road Page 1 -- - - C --- - - From: <gdkraus@transystems com> To: <staylor@ci.coppell.tx. us> Date: 8/2/2006 9'41 45 AM Subject: RE W Bethel Road Suzan, My apologies, I was confusing it with the 5' x 10" boxes. We estimate about 45 calendar days for the 16" water lowering and box culvert/wing wall installation assuming the use of high early strength concrete -----Original Message----- From Suzan Taylor [mailto:staylor@ci.coppell tx.us] Sent: Wednesday, August 02, 2006 8'09 AM To: DL-Garry Kraus Subject: RE. W Bethel Road I just need an estimate for the time it will take to construct the 6' x 10' boxes (approximately 70' along the centerline) that cross under Bethel just east of Loch Lane -the box that is included as part of the channel improvements. We will only close the road for that section of improvements. »> <gdkraus@transystems.com> 8/1/2006 5.24 PM »> Suzan, For 2000 feet of cast in place culvert, we estimate a 5 to 6 month construction time I would think the 16" water lowering could be done within that same time frame. -----Original Message----- From. Suzan Taylor [mailto staylor@ci.coppell.tx.us] Sent: Tuesday, August 01, 2006 11 40 AM To: DL-Garry Kraus Subject: W Bethel Road Garry We are going to City Council with an item to close Bethel Road during the construction of the 4-box culvert at Loch Lane What is your best estimate on how long the road will need to be closed in order to construct the cast in place culverts? We will need to include the time for lowering the 16-inch water line and relocating the manhole out from the culverts. Thanks Suzan Taylor