Loading...
ST9905-CS060724 ~n Taylor - R~~~thel Road Traffic Signals_~ '_ Page 1 ] S' qq-oS- From: To: Date: Subject: <mrwahlstedt@transystems.com> <staylor@cLcoppell.tx.us> 7/24/2006 5.22 51 PM RE. Bethel Road Traffic Signals Thanks - On the signs, I looked at the old spec (new one didn't get attached) - it describes font sizes, but in order to estimate the sign size I ne~QJo know the logo size, the specific spelling of the street name ~.eth~ Bethel Rd, BETHEL RD, etc} and the block number and direction for each sign - or do you just let the ~J1tractor figure it out? The spec allows for 48, 72 and 96" signs. r)ll'i ) i'~d)/,J ~, 1/ j C' If we delete the pedestal pole spec, does the City have one? t r (L 7 ${ ~ C( V/ UA,Ll"- -{i. ~ I ( J{ \ I didn't get the file with the City specs, just one with a list of them. i, {( e m '0' '.vd I v! I have Sandy Lake, but just as a PDF Since we are bidding the signals vOl ,. . as lump sum, should we delete the references to measurement and payment in the detailed specs and say subsidiary to the signal lump sum bid item? Mike -----Original Message----- From Suzan Taylor [mailto.staylor@ci.coppell.tx.us] Sent: Monday, July 24, 2006 5'02 PM To: KC-Mike Wahlstedt Cc: Per Birdsall; DL-Garry Kraus Subject: Re Bethel Road Traffic Signals Michael: 1 It is 'Bethel Road' I have included the specification for illuminated street signs which should answer your questions. 2. Provide hardware only Can leave the corridor name and location of the master controller blank. 3 Use current VIVDS specification (2004 TxDOT 6266) 4 Refer to TxDOT 287 5 Okay to refer to TxDOT's LMA 6 Add slack to quantity 7 Power service should be through pedestal. Go by TxDOT procedures on configuration and wattage. 8 15' is typical. Use TxDOT maximum for 48" foundation 9 City spec controls. Delete TxDOT references on 'Traffic Signal Poles' and "Pedestal Pole Assemblies' We will be paying for the traffic signals 'Per Each' intersection and not as individual items. Garry and Danny had done it that way in the set of draft specifications they provided to us for our review I am providing a pay item description I Suzan Taylor - RE. Bethel Road Traffic SignCJ~_ ~-= Page 2 I that incorporates all of the information that you had for each of the individual pay items. I also included the estimated quantities in the pay item If the estimated quantities are shown on the plan sheets, there is no need to include them in the pay item description. Please review and make any changes to the pay item description as necessary 10 1 C#8 Bare Ground should be continuous. 11 Okay 12. The traffic signals are paid per each intersection I am also attaching a copy of the technical specifications for the W Sandy Lake Road project. The document has all of the specifications you requested and more. Suzan >>> <mrwahlstedt@transystems.com> 7/24/2006 1 35 PM >>> A few questions as we try to wrap up the signal plans: * Can you provide us the legends and sign sizes for the ILSN signs - BETHEL ROAD, ROYAL LANE, FREEPORT PARKWAY, including block numbers, logo size, suffix abbreviations, etc.? Some maps refer to "BETHEL SCHOOL ROAD" - how should the sign/plans read? * On the spread spectrum radios, in the spec we need to provide the corridor name and the location of the master controller Can you provide this info? I also modified the format of the spec slightly to take out the quantities and instead refer to the bid item list (see attached) * Should we use the current VIVDS spec (2004 TxDOT 6266) instead of the 1993 version? * Can we refer to TxDOT 287 for the Pedestal Pole instead of the old TxDOT special? * We have a 52' mast arm at Freeport, so we have also referred to TxDOT's "LMA" long mast arm details. * In the cable quantities, do you include any extra for slack coiled in boxes (6'?) or in the controller base? Currently we have just quantified point to point distances plus cable in the poles. If slack is subsidiary, we should add this to the specs. * Should the power service be via a wood pole or pedestal? Any preferences on configuration/wattage or just go by TxDOT procedure? * We do not have borings/penetration tests for pole foundations - is there a typical depth that you use? * In the attached bid item summary, I have tried to refer to the appropriate City and TxDOT specs. I some cases the TxDOT spec may be redundant or contradictory - I assume in these cases the City spec controls? Any TxDOT references we should delete? * SHould the 1 C#8 Bare ground be spliced in boxes or should there be a continuous run from each pole back to the controller? * I added a reference in the cable section for the 3C#18 to also include the Opticom spec as there are more requirements there (although it calls for 3C#20) * How is the controller cabinet foundation paid for? I SUZ3n Tayl~r - RE. Bethel Road Traffic Si~~":i~s Page 3 I We need electronic copies of the following specs (or are these included in your standard specs?) * Specification for Mast Arm Pole Assembly Polycarbonate Resing Traffic Signal Heads. Underground Traffic Signal Requirements. Multiple Conductor and Signal Conductor Power Service and Service Equipment. Vehicle and Pedestrian Detectors * * * * * Thanks. Mike Michael R. Wahlstedt, PE, PTOE Assistant Vice President TranSystems 2400 Pershing Road, Suite 400 Kansas City, MO 64108 Direct 816-329-8660 Main 816-329-8600 cc: <PBIRDSALL.Town_Center City_oCCoppell@cLcoppell tx.us>, <gdkraus@transystems.com> [Juzan Taylo,l'- Bethel Road Traffi<:;~~~nals Page 1 I From: To: Date: Subject: <mrwahlstedt@transystems.com> <staylor@ci.coppell.tx.us>, <pbirdsall@cLcoppell.tx.us> 7/24/2006 1 32:27 PM Bethel Road Traffic Signals s'\ qq~05 ho\J \ * ~)<~! {d {JroJL -- IJ~/! _if"- o/fv A few questions as we try to wrap up the signal plans: Can you provide us the legends and sign sizes for the ILSN signs - BETHEL ROAD, ROYAL LANE, FREEPORT PARKWAY, including block numbers, logo size, suffix abbreviations, etc.? Some maps refer to "BETHEL /'. . _ SCHOOL ROAD" - how should the sign/plans read? ( - ~-- 1...- * On the spread spectrum radios, in the spec we need to provide the corridor name and the location of the master controller Can you \ i i ./.----- provide this info? I also modified the format of the spec slightly to r--- take out the quantities and instead refer to the bid item list (see '\ attached) ; I ) * Should we use the current VIVDS spec (2004 TxDOT 6266) instead \ of the 1993 version? ,f ~ \l( * Can we refer to TxDOT 287 for the Pedestal Pole instead of the \'j.j i ~ S' . old TxDOT special? -- I' e.:.. l. * We have a 52' mast arm at Freeport, so we have also referred to TxDOT's "LMA" long mast arm details. '-- ~ * In the cable quantities, do you include any extra for slack coiled in boxes (6'?) or in the controller base? Currently we have just .c:;:, /j quantified point to point distances plus cable in the poles. If slack t.,- is subsidiary, we should add this to the specs. . I "1 * Should the power service be via a wood pole or pedestal? Any p.e- c! ~J f-zv \ preferences on configuration/wattage or just go by TxDOT procedurek-- '1 K tJJ j..- (l * We do not have borings/penetration tests for pole foundations - ~ ,( /' j O^) is there a typical depth that you use? '-- -, ]) L /) I), 5 u' c.- o. * In the attached bid item summary, I have tried to refer to the . 'C2" /,,-..J J. ii/"\. appropriate City and TxDOT specs. I some cases the TxDOT spec may be -( i l.ll' ( X ') t\ . redundant or contradictory - I assume in these cases the City spec - y~....l J)! \j -l'-jf\I I'J I;) If\ q () controls? Any TxDOT references we should delete? - ...., \ J* SHould the 1 C#8 Bare ground be spliced in boxes or should there ~ C-' 0-1 JJ.'\ (./ (.J V .~ ' , be a continuous run from each pole back to the controller? \: * I added a reference in the cable section for the 3C#18 to also include the Opticom spec as there are more requirements there (although _ 0 Ie. V it calls for 3C#20) \ v * How is the controller cabinet foundation paid for? \' fA ,.-- We need electronic copies of the following specs (or are these included in your standard specs?)' c" C/.//~4 1- ok- Slc.c;k Iv Q-t7 * Specification for Mast Arm Pole Assembly~ Polycarbonate Resinl Traffic Signal Heads. Underground Traffic Signa~Bequifements.~ Multiple Conductor and Signal Conductor Power Service and Service Equipment. Vehicle and Pedestrian Detectors. * * * * * Thanks. Mike Michael R. Wahlstedt, PE, PTOE Assistant Vice President TranSystems SPECIFICATION FOR SPREAD SPECTRUM RADIO The intent of this specification is to establish WIreless communicatlOns between the new signalIzed intersections at Bethel Road & Royal Lane and at Bethel Road and Freeport Parkway with the rest of the coordmated corridor to the that IS hardWIred. The quote shall include all components necessary to establIsh communIcations from the local intersections (Bethel Road & Royal Lane, Bethel Road & Freeport Parkway) to the master intersection ( ) that will m turn be able to communicate WIth the central computer VIa existing modem and hard lIne. The quote shall mclude on site technIcal aSSIstance for the mstallatton, on SIte technical assistance for any necessary programming, and telephone support for a period of at least 90 days after successful communIcatlOns have been established. The folloWIng is a mmimum list of hardware Items to be provided to accomplIsh the above - MDS 9810 Spread Spectrum Radios - Radio Power Supplies - YagI antenna with mounting hardware - Cable to connect Radio to Naztec NT980 Local Traffic Controller System Up Port - Cable to connect Radio to Naztec NT980 Local Traffic Controller System Down Port - Logic Ground Isolater Boxes - Coax Cable Connectors - Coax Cable The quantity of radios, antennae and coaxial cable shall be as per the plans and bid schedule. All power supplies, mountmg hardware, Isolator boxes, cable connectors, cable between radio and ports and other materials and eqUIpment necessary to provIde a functlOmng radIO system shall be subsidiary to the other radlO system bId Items. If you have any questions concemmg this specIfication, please contact Per Birdsall, Traffic Control/Street Operations Manager at 972-304-3546 or bye-mall atpbirdsall@ci.coppell.tx.us. Betbel Road Project Number: XXXXX UNIT PRICE BID SCHEDULE BASE BID I tern Quantity Unit Description l~hd Price In Words ~ Urit Total No. r Pri e Price ~ T I 2 EA Installation of Highway Traffic Silmals /. T2 I EA Traffic Signal Pole w/36 foot Mast Arm I I i T3 I EA Traffic Simal Pole w/42 foot Mast Arm 1 T~ 3 EA Traffic Signal Pole w/44 foot Mast Arm i T-l) 2 EA Traffic Signal Pole w/48 foot Mast Arm I ! T-ll I EA Traffic Signal Pole w/52 foot Mast Arm I T~ 2 EA Pedestal Pole Assemblies I l T8 19 EA 3-Section Signal Head wlBackplate I T9 8 EA 5-Section Signal Head wlBackplate . I 10 259 LF 2" PVC Conduit l -11 759 LF 3" PVC Conduit i I -12 8 EA Ground Boxes ! -13 2 EA Traffic Signal Controller Foundation 1 -14 783 LF I Conductor #8 Bare Wire \ ; -15 227 LF 3 Conductor #6 Gauge Wire ~ -16 960 LF 5 Conductor # 12 Gauge Wire j -17 651 LF 7 Conductor # 12 Gauge Wire ! -18 1073 LF 16 Conductor # 12 Gaul!.e Wire I T_19 1534 LF 3 Conductor # 18 Gaul!.e Wire i T-20 2 EA Power Service and Pedestal Equipment , J T-21 16 EA Pedestrian Push Button and Sign Assemblies } T-22 2 EA Spread Spectrum Radio System , l T-23 2 EA Yagi Spread Spectrum Radio Antenna and i Mounting Brackets T-24 78 LF SSR Coaxial Cable T-25 84 LF Traffic Signal Foundations 36" . t T-26 15 LF Traffic Signal Foundations 48" i T-27 16 EA Pedestrian Simal Sections : { T-28 2 EA VIVDS Processor System ; I , r-29 8 EA VIVDS Camera Assemblv -30 2 EA VIVDS Set Up System -31 1449 LF VIVDS Communications Cable (Coaxial) i -32 2 EA Opticom Detector Phase Selector -33 8 EA Uni-Directional Opticom Detector I 1 34 2 EA UPS System Tl,35 8 EA Traffic Simal Confirmation Lights T-$6 8 EA Furnishing l1Iuminated Street Sim Names T-i7 8 EA Installation ofl1luminated Street Sim Names \ TOT~L BID ITEMS BASE BID T-1 THRU T-39 $ i \ TAN~IBLE PERSONAL PROPERTY COST $ 1-19 Bidding Documents Pav Item 1'-1 InstallatIon of HIghway Traffic SIgnals ThIs pay Item shall consIst of the furmshmg and mstallatIOn of new hIghway traffic sIgnals mcludmg traffic sIgnal controllers and cabmets m accordance wIth the appropnate detaIls and specIficatIOns, mcludmg CIty of Coppell and I ftt "ft, and TxDOT Item 680 Dunng the 30-day ImtIaI turn-on and operatIOn penod, the Contractor shall utIlIze qualIfied personnel to respond to all trouble calls and to repaIr any malfunctIOns to new control eqUIpment Measurement and Payment for mstallatIOn of highway traffic signals work performed and matenals furmshed completed and m place as provided herem shall be made on the basIs of the pnce bId per each (FA) mtersectIOn and shall be total compensatIOn for furmshmg all labor, matenals, tools, eqUIpment and other mCldentals necessary to complete the work Pay Items. 1-2 Traffic SIgnal.Pole w/36-foot Mast Arm J -3 {'raffic SIgnal.Pole w/42-foot Mast Arm 1'-4 Traffic SIgnal.Pole w/44-foot Mast Arm cl_5 Traffic SIgnal.Pole w/48-foot Mast Arm CI_6 Traffic SIgnal.Pole w/52-foot Mast Arm These pay items shall consist of the furmshmg and mstallatIOn of traffic sIgnal poles with the mdicated mast arm length. SaId traffic signal poles shall be furnished and mstalled m accordance ~~~ ~~Ze~fsC~~~~::~~~~S~L~:~~~~~~61 hOOT HelH 686 ltllJ Stcll1dard Measurement and Payment shall be made on the baSIS of the price bid per each (EA) and shall be total compensatIOn for furmshmg all labor, matenals, and eqUIpment necessary to complete the work. , \ '.,. Pay Item '1'-7 Pedestal Pole Assembhes / ThiS pay item shall consist of the furmshmg and mstallatIOn of pedestal pole a~sembhes m accordance WIth the appropnate detmls and specificatIons, mcludmg TxDOT Item 687 Measurement and Payment shall be made on the baSIS of the pnce per ~acIi~-CEAr~nd shall be total compensatIOn for furmshmg all labor, materIals, and eqUIpment necessary to complete the work. Pay Item 1'-8 3-SectIOn Traffic SIgnal Head w/Backplate Pay Item '1'-9 5-SectIOn Tramc Signal Head w/Backplate These pay items shall consist of the furmshmg and mstallatIOn of signal heads With LED modules for all dIsplays and With backplates. The signal heads shall be black, polycarbonate, and shall be furnished and mstalled m accordance WIth City of Coppell standards and specificatIon '~IIIJ.t..I'fiII1io;_iq"rJt.'I~~:II_l>f~ ~.'.~ and TxDOT Item 682 Traffic signal heads on mast arm poles shall be vertIcally onented. Measurement and Payment shall be made on the baSIS of the pnce per each (EA) and shall be total compensatIOn for furmshmg all labor, matenals, and eqUIpment necessary to complete the work. Pay Item T-IO 2" PYC CondUit Pay Item T-II 3" PYC CondUit This pay Item shall consist of the furnIshIng and InstallatIOn of PYC condUit In accordance wIth Clt) of Coppell standards and specIficatIOn ,:_"t, Oiil.]I~~_~PMwlI1_., , and TxDOT Item 618 and Standard Plan Sheet EO( I )-03 Measurement and Payment shall be made on the basIs of the pnce per lInear foot (LF) and shall be total compensatIOn for furnIshIng all labor, matenals, and eqUipment necessary to complete the work Pay Item T -12 Ground Boxes ThIS pay Item shall consist of the furnIshIng and InstallatIOn of ground boxes In accordance wIth City of Coppell standards and specdicatIOn "'>_1, Oinl..*~'~.d'.* and TxOOT Item 624 and Standard Plan Sheet EO(3 )-03 Measurement and Payment shall be made on the basIs of the pnce per each (EA) and shall be total compensatIOn for furnIshIng all labor, matenals, and eqUIpment nelessary to complete the work. Pay Item T-13 Traffic Signal Controller FoundatIOn ThiS pay Item shall consist of the furnIshIng and InstallatIOn of traffic SIgnal controller foundatIOns In accordance WIth CIty of Coppell standards and specIficatIOn" . ~~~'b'~;!~~::'2~~~~~:~~i~;-~::~~~-~~ Measurement and Payment shall be made on the baSIS of the pnce per each (EA) and shall be total LOmpensatIOn for furnIshIng all labor, matenals, and eqUipment necessary to complete the work. Pay Item T-14 I Conductor #8 Bare Wire Pay Item T -15 3 Conductor #6 Gauge WIre Pay Item '1'-165 Conductor #12 Gauge Wire Pay Item '[-177 Conductor #12 Gauge WIre Pay Item T-18 6 Conductor #12 Gauge WIre These pay Items shall consist of the furnIshIng and InstallatIOn of electncal wire In multIple locatIOns of the project In accordance WIth CIty of Coppell standards and speCIficatIOn ~ Oi. ~.f l'.;_'I"tI'I1r.mW1....~.~QMe:....'~ and TxDOT Item 620 Measurement and Payment shall be made on the baSIS of the pnce per lInear foot (LF) and shall be total compensatIOn t(X furnIshIng all labor, matenals, and eqUipment necessary to complete the work 2 Pay Item T -19 3 Conductor # 18 Gauge Wire These pay Items shall consist of the furnlshmg and mstallatIOn of electncal WIre m multiple locatIOns of the project m accordance with City of Coppell standards and specificatIOns .....;8...," "~~l..~)e~:t..c " and TxDOT Item 620 Measurement and Payment shall be made on the baSIS of the pnce per lmear foot (LF) and shall be total compensatIOn for furmshmg all labor, matenals, and eqUIpment necessary to complete the work. Pav Item '1'-20 Power Service and Pedestal EqUIpment ThiS pay Item shall consist of the furmshmg and mstallatIOn of power service and pedestal eqUIpment m accordance With City of Coppell standards specIfication "Po.'''''_;.. mt.*'''__h.11Y~_~~" and TxD01' Item 628 and Standard Plan Sheets ED( 4 )-03, ED(5)-03, ED-(7)-03 and EO( 8)-03 The Contractor shall be responsible for the power hook-up cost Measurement and Payment shall be made on the baSIS of the pnce per each (EA) and shall be total compensatIOn for furnlshmg all labor. matenals, and eqmpment necessary to complete the work. Pay Item 1'-21 Pedestnan Push Button and Sign AssemblIes ThiS pay Item shall consist of the furmshmg and mstallatIOn of pedestnan push button and Sl n assemblIes m accordance with City of Coppell standards and speclficatIOn IJI_"~.WlL_'~.~iR-~t Pfll._~; and TxOOT Item 688 Pedestnan pushbuttons shall be Installed With a R 1 0-3b sign that shall be modified to mclude an arrow mdlcatmg the deSired crossmg direction and shall meet all reqmrements of the Amencan With DisabilIties Act. Measurement and Payment shall be made on the baSIS of the pnce per each (EA) and shall be total compensatIOn for furmshmg all labor, matenals, and equipment necessary to complete the work. Pay Item '1'-22 Spread Spectrum RadIO System ThiS pay Item shall consist of the furmshmg and mstallatlOn of spread spectrum radIO systems m accordance With City ofCoppell standards and ''SIII*~~tJt speCificatIOn. Measurement and Payment shall be made on the baSIS of the price per each (EA) and shall be total compensatIon for furnishing all labor. matenals, and eqUIpment necessary to complete the work. Pay Item '1'-23 Yagl Spread Spectrum RadIO Antenna and Mountmg Brackets ThiS pay Item shall consist of the furmshmg and mstallatIOn of Yagl SSR antennas and mountmg brackets m accordance With City of Coppell standards and '..~_b~ specificatIOn. Measurement and Payment shall be made on the baSIS of the pnce per each (EA) and shall be total compensatIOn for furmshmg all labor, matenals, and eqUIpment necessary to complete the work. 3 Pay Item T -24 SSR Coaxial Cable This pay It~m shall consist of the furnIshl,ng a~d, mstallatlOn of SSR ~I_~;..le locatIOns 01 the project m accordance with City ot Coppell standards and .', ~ <? .'~ specl ficatlon. Measurement and Payment shall be made on the basIs of the pnce per lInear foot (LF) and shall be total compensatIOn for furnIshmg all labor, matenals, and eqUIpment necessary to complete the work Pay Item T-25 Traffic Signal FoundatIOns 36" Pav Item '1'-26 Traffic Signal FoundatIOns 48" These pay Items shall consist of the furnIshmg and mstallatlOn of traffic Signal foundatIOns m accordance With the appropnate detmls and specIf'icatlons, mcludmg TxOOT Item 656 and Standard Plan Sheets TS-FO-99 and LMA(2)-01 Measurement and Payment shall be made on the baSIS of the pnce per lInear foot (LF) and shall be total compensation for furnlshmg all labor, matenals, and eqUIpment necessary to complete the work. Pay Item T-27 Pedestnan Signal Sections ThiS pay Item shall consist of the furnIshmg and mstallatlOn of polycarbonate, symbolIc pedestnan Signal sections m accordance With the appropnate detmls and speCificatIOns, mcludmg TxOOT Item 682 The pedestnan Signals shall be a smgle sectIOn, LED, hand/man display Measurement and Payment shall be made on the baSIS of the pnce per each (EA) and shall be total compensatIOn for furnIshmg all labor, matenals, and eqUIpment necessary to complete the work. Pay Item T -28 VIVOS Processor System Pay Item T-29 VIVOS Camera Assembly Pay Item T-30 VIVOS Set Up System Pay Item T-31 VIVOS CommunIcatIOns Cable (Coaxial) These pay Items shall consist of the furnIshmg and mstallatlOn of vehicle Imagmg vehicle detectIOn systems m accordance With the appropnate detmls and speCificatIOns, mcludmg TxDOT's 2004 SpeCial SpecIficatIon 6266 Vehicle Imagmg Vehicle DetectIOn System (VIVDS) Measurement and Payment shall be made on the baSIS of the pnce per each (EA) for the Processor System, Camera Assembly, and Set Up System and per Imear foot (LF) for the CommUnIcatIOns Cable and shall be total compensation for furnIshmg all labor, matenals, and eqUIpment necessary to complete the work. Pay Item T -32 Optlcom Detector Phase Selector ThiS pay Item shall consist of the furnIshmg and mstallatlon of optlcom detector phase selectors m accordance With the appropnate detatls and speCificatIOns, mcludIng the "B'III__lt R.~..1I11i." specIficatIOn and shall Include a card rack per the speCIficatIOn unless other proVISIOns are made for mstallatIon of the phase selector In the controller cabmet. 4 Measurement and Payment shall be made on the basIs of the prIce per each (EA) and shall be total compensatIon for furnIshmg all labor, materIals, and eqUIpment necessary to complete the work. Pay Item T - 33 U m - DIrectIOnal OptIcom Detector ThIs pay Item shall conSIst of the furmshmg and mstallatIOn of um-dIrectIonal optlcom detectors m accordance wIth the approprIate detaIls and specIfications, mcludmg the ~_'ftlli.rl Rfl~~" specIficatIOn ThIS Item shall also mclude the necessary mountmg brackets for the detector (Pelco MmI Astro-Brac or equal) Measurement and Payment shall be made on the baSIS of the prIce per each (EA) and shall be total compensatIOn for furmshmg all labor, materIals, and eqUIpment necessary to complete the work. Pay Item '[-34 UPS System ThIS pay Item shall mclude the furnIshmg and mstallatIOn of an unmterrupted power supply system, ~iai'.'.i;~""-, or equal WIth a SIX battery Labmet m accordance WIth the approprIate detaIls and specIficatIOns, mcludmg TxDOT SpecIficatIOns Measurement and Payment shall be made on the baSIS of the pnce bId per each (EA) and shall be total compensatIOn for furmshmg all labor, materIals, and eqUIpment necessary to complete the work Pay Item T-35 Traffic SIgnal ConfirmatIon LIght ThIS pay Item shall conSIst of the furnIshmg and mstallatIon of traffic SIgnal confirmatIon lIght assemblIes WIth clear globe on the mast arms and m the locatIons as deSIgnated by the Owner Contractor shall furnIsh and mstall PeIOtJ:'M'Nrailll'&:S'- traffic SIgnal confirmatIOn lIghts, or equal Measurement and Payment shall be made on the baSIS of prIce bId per each (EA) and shall be total compensation for furmshmg all materIals, tools, eqUIpment, lahor, and any other mCIdentals necessary to complete the work. Pay Item T-36 FUrnIshmg of Illummated Street Name SIgns ThIS pay Item shall conSIst of the furnIshmg of Illummated street name SIgns m accordance WIth the City of Coppell '.ilil_J'.:0rr 11_'JINl.'~:'" speCIficatIOn. Measurement and Payment shall be made on the baSIS of the pnce bid per each (EA) and shall be total compensation for furnIshmg all materIals and any other mCldentals necessary to complete the work. Pay Item T-37 InstallatIon of Illummated Street Name SIgns ThIS pay Item shall conSIst of the mstallatIOn of Illummated street name SIgns at the locatIons speCIfied hy the Owner m accordance WIth the City of Coppell (Wrr@iTII'~t1l11lllllllurro?'nfm]~ specI ticatIOn. Measurement and Payment shall be made on the baSIS of the pnce bid per each (EA) and shall be total compensatIOn for furnlshmg all materIals and any other mCldentals necessary to complete the work. 5