ST0004(2006)-CS060912 (3)Adik
September 12, 2006
Advanced Paving Company
2257 Joe Field Rd
Dallas TX 75229
T H E G I T Y O F
COPPELL
RE Freeport Parkway Reconstruction, #ST 00 -04 (2006)
Final Acceptance
Dear Ms. Seale
Representatives of the City of Coppell have confirmed a final inspection of paving for the
referenced project. Maturity on the two -year maintenance bond will be two years from the date of
this letter
A follow -up inspection of the project will be conducted prior to the lapse of the two -year bond
period. If any punchhst items are noted at that time, you will be contacted to make repairs. 'thanks
for your cooperation.
Sincerel
Keith R. Marvin, P.E.
Assistant City Engineer
Office 972 - 304 -7044
Fax. 972 - 304 -3570
kmarvm @ci coppell tx us
cc Ken Griffin, P.E, Director of Engineering & Public Works
Glenn Hollowell, P.E., Asst. Director of Public Works
Per Birdsall, Street Operations Manager
255 PARKWAY * PO BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972'304 3673