Loading...
ST0004(2006)-CS060912 (3)Adik September 12, 2006 Advanced Paving Company 2257 Joe Field Rd Dallas TX 75229 T H E G I T Y O F COPPELL RE Freeport Parkway Reconstruction, #ST 00 -04 (2006) Final Acceptance Dear Ms. Seale Representatives of the City of Coppell have confirmed a final inspection of paving for the referenced project. Maturity on the two -year maintenance bond will be two years from the date of this letter A follow -up inspection of the project will be conducted prior to the lapse of the two -year bond period. If any punchhst items are noted at that time, you will be contacted to make repairs. 'thanks for your cooperation. Sincerel Keith R. Marvin, P.E. Assistant City Engineer Office 972 - 304 -7044 Fax. 972 - 304 -3570 kmarvm @ci coppell tx us cc Ken Griffin, P.E, Director of Engineering & Public Works Glenn Hollowell, P.E., Asst. Director of Public Works Per Birdsall, Street Operations Manager 255 PARKWAY * PO BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972'304 3673