ST0004(2006)-CS060824ADVANCED - ' PAVING Co,w
PROFESSIONALS IN PAVING CONSTRUCTION a REPAIRS
August 24, 2006
Keith Marvin
Engineer
City of Coppell
255 Parkway
Coppell, TX 75019
Project
Freeport Parkway Repairs
Hwy 635 to Bethel Road
Coppell, TX
Re " AS BLJILT" REPAIR RECORD
Mr Marvin,
Please accept this letter as confirmation of the completion of all repairs for the
Freeport Parkway Project from Interstate 635 to Bethel Road per our contract with
the City of Coppell
Please see the attached "As Built" list of completed repair holes including the balance
of miscellaneous; holes which were completed prior to August 9, 2006 and a set of plans
with marked "as bui t" locations completed
All final pay applications have been submitted, in addition, the Two Year Maintenance
Bond is in place and has been delivered to the City of Coppell
We have also provided the City of Coppell with an original of our "Consent of Surety" to
final payment
Thank you for the opo unity to provide service to the City of Coppell
Respectfully, ,
; e � s Rogers
Chief Estimato �-
Cc_ Rick O'Dell
Les Rogers. 2257 Joe Field Road, Dallas, TX 75299 972 - 245 -0000
2257 Joe FMWRW `0c ,7�exas 75229 - Dallas (972) 245 -0000 - Fax (972) 2AATORWARIIA91817) 921 -5642
Toll Free (877) 853 -1333
advancedpavingco.com
20012 Tl l 6t It 1111, 90 VF 80
ADVANCED PAVING COMPANY
Final punch list items:
Freeport Pkmry. Repairs "AS Built" completions:
I. Repairs
# 100
to
# 130
IL Repairs
# 200
to
# 299
Ill. Repairs
Add -ons
Ln
3.
"F" 7x 6
# 300
to
# 316
"G" 50;2
# 350
to
# 360
IV. Miscellaneous Repair areas:
1.
"A,B,C,D,I=--1"
Outside
Ln
12x12 ,8x11,6x'10,12x12,7x12
2.
"E -2" 8 ;c12
Outside
Ln
3.
"F" 7x 6
Inside
Ln
4.
"G" 50;2
Inside
Ln
5.
"H" 8x1;2
Inside
Ln
6.
1" 802
Outside
Ln
7.
"J" 12x21)
Inside
Ln
Completed 08- 0402006
Completed
Completed
Completed
Completed
East Side of Median
near 635
between Dividend & Wrangler
near Fritz
between Gateway & Southwestern
at Southwestern
adjacent to "H"
near Burn
V. Remove, clean and reseal pavement joints:
Repair both lanes and curb on both sides of median four LBJ Frwy. to Bethel Road.
Completed 08-09 -2006
This completes the balance of work to be done under the contract.
es Rogers -
Chief Estimator
x:00 (n it -I 07 [ T ]HJ, 90 67 180
ADVANCED PAVING COMPANY
2257 Joe Field Road
Dallas, TX 75229
972 -245 -000 Fax: 972- 247 -2011
FAX
To:
Keith Marvin
Engineering Dept.
City of Coppell
Fax: 972 - 304 -3570
PLEASE COPY
RICK O'DELL
CITY INSPECTOR
Les Rogers
Estimator
Advanced Paving Company
Fax: 972 -247 -2011
ATTACHMENTS:
"as built"' REPAIR COMPLETION RECORD / FREEPORT PKWY.