FREEPORT PARKWAY RECONSTRUCTION PROJECT
ST 00 - 04
Preconstruction Conference Agenda
March 29, 2006 @ 10 a.m.
1. City of Coppell Guidelines
a. Working hours Extra hours
b Noise ordinance
c Erosion Control Ordinance
d. Changes to plans and specifications
e. Keep set of 2005 Standard Construction Details on site
f Responsible party on site at all times
g. Water Utilities Phone No (972)- 462 -5155
h. Streets Department. Phone No (972)- 462 -5150
2. Bidding Documents
a. Addendum No ONE
b Liquidated damages for this project are $240 00 per day
U �
3. Overtime
a. Any hours worked before 8 a.m. and after 5 p.m., all weekends and holidays are subject to
overtime.
4. Testing Requirements
a. City will arrange for the construction materials testing — contractor is responsible for any retests
and /or any tests before 8 00 a.m. or after 5 p.m.
5. Prior to Construction
a. Documentation of existing conditions
b Measure removal items
c City will notify adjacent property owners and provide contractor with list of names and addresses
6. Have In Place
a. All necessary traffic control and warning devices
b Sanitary facilities
c Erosion control
7. Traffic Control
a. Continuous flow of traffic in both directions must be maintained for the duration of the project.
b. Consideration shall be made for access to all adjacent streets and businesses at all times.
c Wrangler Drive provides access to Coppell Middle School West.
8. Submit For Approval (two copies required)
a. Detailed Progress Schedule
b List of subcontractors and suppliers
c Traffic Control Plan
d. Responsible person — name and 24 hour numbers
e. Concrete batch designs
f. Submit example of stamped concrete (l required)
9. Pay Requests
a. Agree on quantities
b Agree on time charged
c Check erosion protection
d. Traffic control, ingress and egress
e. Safety issues, cleanup
f Ensure that 'as-built' record drawings are current
g. Ensure that all complaints have been addressed
2
ADVANCED PAVING COMPANY
List of Personnel
Sam L. Garrett
President/Owner
Earl Pevehouse
Concrete
Superintendent
Les Rogers
Chief Estimator / Commercial Business Development
Irogers advancedpavingco.com
office. 972 - 245 -0000
Becky Seale
Office Manager
cell: 214 - 325 -4294
cell: 817 - 688 -5245
cell: 241 - 326 -4317
972 - 245 -0000
Cindi Henry
Human Resources and Payroll Coordinator