ST0004(2006)-CS060406FKe ith Ma rvin - Coppell_ADD -ON7 00 d oe
Page 1
ADVANiCED PAVN�G �Cdd
Professoonals An PavAng Construd;on & Repams
April 4, 2006
Keith Marvin Project:
Engineer Freeport Parkway Repairs
City of Coppell ADDITIONAL REPAIRS
255 Parkway
Coppell, TX 75019
Re Additional Concrete Street Repairs / Not in the Contract
• Pricing will be based on the repair unit price negotiated in the
existing contract:
• 9 out of the 30 add -on repairs are at or near intersections.
• Total area for the additional repairs.
approximately 7,592 s.f
less the "MISC " - 3,567 s.f.
balance to be considered 4,025 sf
SPECIFICATION REVISION Flex Base Material
• Changing the subgrade material specification from cement treated base(ctb)
to an approved flex base material would be a cost savings of $ 20,320 00
• This revision would decrease the cost of concrete for this project by $ 0 50 / s.f
• The unit price for placement of 8" concrete would be. $ 7 00 / s.f
COSTS FOR THE ADDITIONAL REMOVE AND REPLACE 8" CONCRETE
• 4,025 square feet / Unit: $ 7 00 /sf Total $ 28,175 00
• 129 linear feet curb Total $ n / a
• 240 linear feet Reseal / Unit: $ 1 15 /If Total $ 276.00
• Total based on the addition of 4,025 / s.f Total $ 28,451 00
Respectfully,
Les Rogers
Chief Estimator
Les Rogers 2257 Joe Field Road, Dallas, TX 75299 972 - 245 -0000
cell: 214 -325 -4317 fax: 972 - 247 -2011
K eith Ma - net cos ts for add - on
From: "Les Rogers" < Irogers @advancedpavingco com>
To: <kmarvin @ci.coppell.tx. us>
Date: 4/6/2006 6 3915 PM
Subject: net costs for add - on
Keith,
Sorry I forgot to net out the amount in the letter
The $ 20,320 00 would be deducted from the $ 28,175 00
The differance or costs that would be above the current
contract price ( to do all the repairs ) would be.
$ 7,85500
Les Rogers
ADVANCED PAVING COMPANY
Irogers @advancedpavingco com
972 - 245 -0000
972 - 247 -2011 fax
Page 1
214 - 325 -4317 cell
Keith Ma - Uni price for add itional repairs
From: "Les Rogers" < Irogers @advancedpavingco com>
To <kmarvin @ci.coppell.tx. us>
Date: 4/6/2006 6 18 49 PM
Subject: Unit price for additional repairs
Keith,
Please find attached a copy of our letter addressing the possible costs savings if the subgrade
specification is changed from a cement treated base process to an approved flex base material.
Respectfully,
Les Rogers
ATTACHMENT
ADVANCED PAVING COMPANY
Irogers @advancedpavingco com
972 - 245 -0000
972 - 247 -2011 fax
214 - 325 -4317 cell