Loading...
ST0004(2006)-CS060406FKe ith Ma rvin - Coppell_ADD -ON7 00 d oe Page 1 ADVANiCED PAVN�G �Cdd Professoonals An PavAng Construd;on & Repams April 4, 2006 Keith Marvin Project: Engineer Freeport Parkway Repairs City of Coppell ADDITIONAL REPAIRS 255 Parkway Coppell, TX 75019 Re Additional Concrete Street Repairs / Not in the Contract • Pricing will be based on the repair unit price negotiated in the existing contract: • 9 out of the 30 add -on repairs are at or near intersections. • Total area for the additional repairs. approximately 7,592 s.f less the "MISC " - 3,567 s.f. balance to be considered 4,025 sf SPECIFICATION REVISION Flex Base Material • Changing the subgrade material specification from cement treated base(ctb) to an approved flex base material would be a cost savings of $ 20,320 00 • This revision would decrease the cost of concrete for this project by $ 0 50 / s.f • The unit price for placement of 8" concrete would be. $ 7 00 / s.f COSTS FOR THE ADDITIONAL REMOVE AND REPLACE 8" CONCRETE • 4,025 square feet / Unit: $ 7 00 /sf Total $ 28,175 00 • 129 linear feet curb Total $ n / a • 240 linear feet Reseal / Unit: $ 1 15 /If Total $ 276.00 • Total based on the addition of 4,025 / s.f Total $ 28,451 00 Respectfully, Les Rogers Chief Estimator Les Rogers 2257 Joe Field Road, Dallas, TX 75299 972 - 245 -0000 cell: 214 -325 -4317 fax: 972 - 247 -2011 K eith Ma - net cos ts for add - on From: "Les Rogers" < Irogers @advancedpavingco com> To: <kmarvin @ci.coppell.tx. us> Date: 4/6/2006 6 3915 PM Subject: net costs for add - on Keith, Sorry I forgot to net out the amount in the letter The $ 20,320 00 would be deducted from the $ 28,175 00 The differance or costs that would be above the current contract price ( to do all the repairs ) would be. $ 7,85500 Les Rogers ADVANCED PAVING COMPANY Irogers @advancedpavingco com 972 - 245 -0000 972 - 247 -2011 fax Page 1 214 - 325 -4317 cell Keith Ma - Uni price for add itional repairs From: "Les Rogers" < Irogers @advancedpavingco com> To <kmarvin @ci.coppell.tx. us> Date: 4/6/2006 6 18 49 PM Subject: Unit price for additional repairs Keith, Please find attached a copy of our letter addressing the possible costs savings if the subgrade specification is changed from a cement treated base process to an approved flex base material. Respectfully, Les Rogers ATTACHMENT ADVANCED PAVING COMPANY Irogers @advancedpavingco com 972 - 245 -0000 972 - 247 -2011 fax 214 - 325 -4317 cell 1 P age