ST0004(2006)-LR060517LAWRENCE ENGINEERING ENVIRONMENTAL — GEOTECHNICAL — CONSTRUCTION TESTING 12500 Schroeder Suite B Dallas, TX 75243 Phone (972) 497 -9100 Fax (972) 497 -9108 DAILY ACTIVITY REPORT CLIENT. City of Coppell DISTRIBUTION PROJECT: Freeport Parkway Rick O'Dell — City of Coppell REPORT M C06- 0303 -33 INSPECTION DATE 5/15/06 REPORT DATE. 5/17/06 Pavement Sub -base Proof - Rolling Observation On May 15, 2006, Ozzie Flores of Lawrence Engineering was present at the Freeport Parkway Pavement Reconstruction Project to observe proof - rolling of Freeport Parkway sub -base materials Sections of Freeport Parkway pavement were removed and previous field density tests had indicated compaction failures or possible proctor materials mis -match The areas to be proof - rolled are as follows 1) Northbound Freeport Pkwy — outside lane — Section #119 2) Northbound Freeport Pkwy — outside lane — Section #120 To perform the proof - rolling operations, Advance Paving Company supplied a dual axle, 15 cubic yard dump truck, loaded with concrete paving debris No actual weight ticket was available at the time of observation Estimated weight of approximately 65,000 to 72,000 gross pounds based on truck weight and load capacity The observation results indicated no areas of soft sub -base materials Areas observed were recommended to pass and ready to receive flexible base subgrade Note: This report is for the exclusive use of the client addressed. This report may not be reproduced, except in its entirety without The written consent of LE. Results apply only to above tests LAWRENC ENGINEERI LAProjectslProjects 20061C06 -0303 Freeport Pkwy1C06- 0303 -33 Daily activity report.doc LAWRENCE ENGINEERING ENVIRONMENTAL — GEOTECHNICAL — CONSTRUCTION TESTING 12500 Schroeder Suite B Dallas, TX 75243 Phone (972) 497 -9100 Fax (972) 497 -9108 DAILY ACTIVITY REPORT CLIENT City of Coppell DISTRIBUTION* PROJECT- Freeport Parkway Rick O'Dell — City of Coppell REPORT #• C06- 0303 -33 Sam Garret — City of Coppell INSPECTION DATE: 5/16/06 REPORT DATE. 5/17/06 On May 16, 2006, Osvaldo Flores of Lawrence Engineering was present at the Freeport Parkway Pavement Reconstruction Project to observe proof - rolling of Freeport Parkway section #119 west and 120 wests All areas observed, complies with the city specifications. Note: This report is for the exclusive use of the client addressed. This report may not be reproduced, except in its entirety without The written consent of LE. Results apply only to above tests. LAWRENCE ENGINEERING LAProjects \Projects 2006 \CO6 -0303 Freeport Pkwy \C06 - 0303 -33 Daily activity report.doc