Loading...
ST0004(2006)-LR060622LAWRENCE ENGINEERING ENVIRONMENTAL - GEOTECHNICAL - CONSTRUCTION MATERIALS TESTING 12500 Schroeder Suite B Dallas, Texas 75243 Phone (972) 497 -9100 Fax (972) 497 -9108 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT City of Coppell REPORT DISTRIBUTION PROJECT Freeport Parkway Rick O'Dell - City of Coppell LE REPORT #- C06- 0303 -42 Sam Garrett - Advanced Paving Company REPORT DATE 6/22/06 SPECIFICATIONS PROJECT DATA Strength (psi) 4200128 Placement Date 5/25/2006 Slump (in ) 3 -5 Sampled By O Flores Air Content ( %) 3 -6 Weather Clear Concrete Temp ( °F) 95 max Supplier /Mix: Beall/3401 Ticket # Slump (in ) Conc Temp ( °F) Placement Location Remarks FIELD DATA SET #1 13664334 Time Batched 7 40 AM Time Sampled *7" Air Content: 4 9 Unit Weight 82 Ambient Temp ( °F) 79 Yardage (c.y) 50 of 100 Paving replacement at Freeport Parkway section #124 Sta 21+ 25 *Contractor was notified Slump does not conform 810 AM N/A Ticket #- Slump (in ) Conc Temp ( °F) Placement Location Remarks FIELD DATA SET# Time Batched Time Sampled Air Content: Unit Weight: Ambient Temp ( °F) Yardage (c y ) CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39 Set # Cylinder # Test Date Age (Days) Max. Load (lbs) Area (sq in Strength (psi) FC Notes 1 -1 6/1/2006 7 121040 2827 4280 B 1 1 -2 6/22/2006 28 141010 2827 4990 D 1 -3 6/22/2006 28 148940 2827 5270 D 1 -4 - H (1) NORMAL CYLINDER SIZE 6" X 12 ", AREA 28.27 sq in. UNLESS NOTED ABOVE. (2) FAILURE TYPE A =CONE, B =CONE AND SPLIT C =CONE AND SHEAR. D= SHEAR, E= COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS C138 C143 C172.. C231 N ote I his report is tor the exclusive use of e Client addresse This report may not be reproduced except in its entirety, without the written consent of LE Results apply only to above tests LAWRENCE ENGINEERING � -V -010 L.1Projects\Projects 20061C06 -0303 Freeport Pkwy\C06- 0303 -42 Concrete Insp Report 5 -23 LAWRENCE ENGINEERING ENVIRONMENTAL - GEOTECHNICAL - CONSTRUCTION MATERIALS TESTING 12500 Schroeder Suite B Dallas, Texas 75243 Phone (972) 497 -9100 Fax (972) 497 -9108 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT City of Coppell REPORT DISTRIBUTION PROJECT Freeport Parkway Rick O'Dell - City of Coppell LE REPORT #• C06- 0303 -42 Sam Garrett - Advanced Paving Company REPORT DATE 6/5/06 SPECIFICATIONS PROJECT DATA Strength (psi) 4200/28 Placement Date 5/25/2006 Slump (in ) 3 -5 Sampled By O Flores Air Content ( %) 3 -6 Weather Clear Concrete Temp ( °F) 95 max Supplier /Mix Beall /340L1504 FIELD DATA SET #1 6/1/2006 7 Ticket # 13664334 Time Batched 7 40 AM Time Sampled 8 10 AM Slump (in) *7" Air Content: 4 9 Unit Weight: N/A Conc Temp ( °F) 82 Ambient Temp (°F) 79 Yardage (c y) 50 of 100 Placement Location Paving replacement at Freeport Parkway section #124 Sta 21+ 25 6/22/2006 Remarks *Contractor was notified Slump does n conform 2827 Ticket # Slump (in ) Conc Temp ( °F) Placement Location Remarks FIELD DATA SET# Time Batched _ Air Content: _ Ambient Temp ( °F) Time Sampled Unit Weight: Yardage (c y ) CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39 Set #1 Cylinder # Test Date Age (Days) Max. Load (lbs) Area (sq in Strength (psi) FC Notes 1 -1 6/1/2006 7 121040 2827 4280 B 1 1 -2 6/22/2006 28 2827 1 -3 6/22/2006 28 2827 1 -4 - H 2827 (1) NORMAL CYLINDER SIZE 6" X 12" AREA 28.27 sq in UNLESS NOTED ABOVE. (2) FAILURE TYPE A =CONE, B =CONE AND SPLIT C =CONE AND SHEAR D= SHEAR.. E= COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS C138 C143 C172 C231 N ote I his report is tor the exclusive use ot the Client addresse This report may not be reproduced except in its entirety, without the written consent of LE Results apply only to above tests LAWRENCE ENGINEERI G� q 5 -/0 G L:1Projects\Projects 20061C06 -0303 Freeport Pkwy\C06- 0303 -42 Concrete Insp Report 5 -23