Loading...
ST0004(2006)-LR060807LAWRENCE ENGINEERING ENVIRONMENTAL - GEOTECHNICAL - CONSTRUCTION MATERIALS TESTING 12500 Schroeder Suite B Dallas Texas 75243 Phone (972) 497 -9100 Fax (972) 497 -9108 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT City of Coppell REPORT DISTRIBUTION PROJECT Freeport Parkway Rick O'Dell - City of Coppell LE REPORT # C06- 0303 -52 Sam Garrett - Advanced Paving Company REPORT DATE 8/7/06 SPECIFICATIONS PROJECT DATA Strength (psi) 4 000 @ 28 day Placement Date 7/10/2006 Slump rin I 3- 5 Sampled By O Flores Air Content ( %) 3 -6 Weather Sunny Concrete Temp (`F) 95 max Supplier /Mix: Beall /340L1504 FIELD DATA SET #1 Ticket #- 13667067 Time Batched 12 36 PM Time Sampled 1 22 PM Slump (in ; 5" Air Content: 4 0 Unit Weight: N/A Conc Temp '`F) 84 Ambient Temp (`F) 94 Yardage (c y) 20 of 60 Placement Location Pavement replacement - Section #212 westslde sta 12 +82 Remarks Ticket # Slump Jn ) Conc Temp ( °F) Placement Location Remarks FIELD DATA SET# Time Batched Time Sampled Air Content Unit Weight: Ambient Temp ;'F) Yardage (c y ) CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39 Set #1 Cylinder # Test Date Age (Days) Max Load (Ibs) Area (sq in Stren th (psi) FC Notes 1 -1 7/17/2006 7 110770 2827 3920 C 1 1 -2 8/7/2006 28 135950 2827 4810 B 1 -3 8/7/2006 28 138430 2827 4900 B 1-4 Hold -H (1) NORMAL CYLINDER SIZE 6" X 12" AREA 28 27 sq in UNLESS NOTED ABOVE. (2) FAILURE TYPE A =CONE B =CONE AND SPLIT - AND SHEAR D =SHEAR E= COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS 0138 C143 C1 C231 1707e report is tor the exclusive use of e Client addressed This report may not be reproduced except in its entirety without the written consent of LE Results apply only to above tests Rxa LAWRENCE ENGINEERIN L Projects\Projects 2006\C06 -0303 Freeport Pkwy\C06- 0303 -52 Concrete insp Report 7- 10.x1s A n_ nv /n0 /ni LAWRENCE ENGINEERING ENVIRONMENTAL - GEOTECHNICAL - CONSTRUCTION MATERIALS TESTING 12500 Schroeder Suite B Dallas, Texas 75243 Phone (972) 497 -9100 Fax (972) 497 -9108 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT- City of Coppell REPORT DISTRIBUTION PROJECT Freeport Parkway Rick O'Dell - City of Coppell LE REPORT # C06- 0303 -52 Sam Garrett - Advanced Paving Company REPORT DATE 7/11/06 SPECIFICATIONS Set # PROJECT DATA Strength (psi) 4 200 (g 28 day Max. Load (lbs ) Placement Date 7/10 12006 Slump (in ) 3-5 Sampled By O Flores Air Content ( %) 3 -6 Weather Sunny Concrete Temp ( °F) 95 max 1 -1 Supplier /Mix: Beal1/340L1504 110770 2827 FIELD DATA SET #1 C 1 Ticket #- 13667067 Time Batched 12 36 PM Time Sampled 1 22 PM Slump (in) 5" Air Content: 40 Unit Weight: N/A Conc Temp ( °F) 84 Ambient Temp ( °F) 94 Yardage (c y } 20 of 60 Placement Location Pavement replacement - Section #212 westside sta 12 +82 Hold Remarks FIELD DATA SET# Ticket # Time Batched Time Sampled - Slump (in) Air Content: Unit Weight: Conc Temp ( °F) Ambient Temp (`F) Yardage (c.y ) Placement Location Remarks CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39 Set # Cylinder # Test Date Age (Days) Max. Load (lbs ) Area (sq in) Strength (psi) FC Notes 1 -1 7/17/2006 7 110770 2827 3920 C 1 1 -2 8/7/2006 28 2827 1 -3 817/2006 28 2827 1 -4 Hold (1) NORMAL CYLINDER SIZE 6" X 12" AREA 28 27 sq in. UNLESS NOTED ABOVE (2) FAILURE TYPE A =CONE, B =CONE AND SPLIT C =CONE AND SHEAR D =SHEAR E= COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS C138 C143 C172 C231 Note is report is tor the exclusive use of e Ulient addressed This report may not be reproduced except in its entirety without the written consent of LE. Results apply only to above tests LAWRENCEf NgINEERIN D 7/r 7 G L \ProjectstProjects 20061C06 -0303 Freeport PkwylC06- 0303 -52 Concrete Insp Report 7 -10