Loading...
ST0004(2006)-LR060724LAWRENCE ENGINEERING ENVIRONMENTAL - GEOTECHNICAL - CONSTRUCTION MATERIALS TESTING 12500 Schroeder Suite B Dallas Texas 7 5243 Phone (972) 497 -9100 Fax (972) 497 -9108 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT City of Coppell REPORT DISTRIBUTION PROJECT Freeport Parkway Rick O'Dell - City of Coppell LE REPORT #• C06- 0303 -55 Sam Garrett - Advanced Paving Company REPORT DATE 8114/06 SPECIFICATIONS Set # PROJECT DATA Strength 'psi) 4200/28 Max. Load (Ibs) Placement Date 7/14/2006 Slump (in i 3 -5 Sampled By O Flores Air Content r %I 3 -6 Weather Clear / Hot Concrete Temp (`F, 95 max 1 -1 Supplier /Mix Beall /340L1504 110870 2827 FIELD DATA SET #1 D 1 Ticket # 13667583 Time Batched 3 33 AM Time Sampled 4 05 AM Slump (in i 5" Air Content: 39 Unit Weight. N/A Conc Temp i 'F) 86 Ambient Temp (`F) 78 Yardage (c y) 10 Placement Location Paving - Freeport Parkway Repair Hold Remarks FIELD DATA SET# Ticket #- Time Batched Time Sampled Slump (in) Air Content Unit Weight: Conc Temp ��F) Ambient Temp (`F) Yardage (c y Placement Location Remarks CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39 Set # Cylinder # Test Date Age (Days) Max. Load (Ibs) Area (sq in Strength (psi) FC I Notes 1 -1 7/21 /2006 7 110870 2827 3920 D 1 1 -2 8/11/2006 28 134990 2827 4780 A 1 -3 8/11/2006 28 137950 2827 4880 A 1 -4 Hold 2827 (1) NORMAL CYLINDER SIZE 6" X 12" AREA 28.27 sq in UNLESS NOTED ABOVE (2) FAILURE TYPE A =CONE B =CONE AND SPLIT C =CONE AND SHEAR D =SHEAR E= COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS C138 C143 0172 C231 N ote is report is for the exclusive use of e Client addresse This report may not be reproduced except in its entirety without the written consent of LE Results apply only to above tests W o ,,,Jr- � awyl" LAWRENCE ENGINEERING L P^oiects \Projects 2006\C06 -0303 Freeport PkwylC06- 0303 -55 Concrete Insp Report 7 -14 xis LAWRENCE ENGINEERING ENVIRONMENTAL - GEOTECHNICAL - CONSTRUCTION MATERIALS TESTING 12500 Schroeder Suite B Dallas, Texas 75243 Phone (972) 497 -9100 Fax (972) 497 -9108 CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT City of Coppell REPORT DISTRIBUTION PROJECT Freeport Parkway Rick O'Dell - City of Coppell LE REPORT # C06- 0303 -55 Sam Garrett - Advanced Paving Company REPORT DATE 7/24/06 SPECIFICATIONS PROJECT DATA Strength (psi) 4200/28 Placement Date 7/14/2006 Slump (in) 3 -5 Sampled By O Flores Air Content ( %) 3 -6 Weather Clear / Hot Concrete Temp (`F) 95 max Supplier /Mix: Beall/3401-1504 FIELD DATA SET #1 Ticket # 13667583 Time Batched 3 33 AM Time Sampled 4 05 AM Slump (in I 5" Air Content: 39 Unit Weight: N/A Conc Temp ( °F) 86 Ambient Temp ( °F) 78 Yardage (c.y) 10 Placement Location Paving - Freeport Parkway Repair Remarks FIELD DATA SET# Ticket #- Time Batched Time Sampled Slump (in) Air Content: Unit Weight: Conc Temp (`F) Ambient Temp ( °F) Yardage (c y ) Placement Location Remarks CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39 Set #1 Cylinder # Test Date Age (Days) Max. Load (Ibs) Area (sq in Strength (psi) FC Notes 1 -1 7/21/2006 7 110870 2827 3920 D 1 1 -2 8/11/2006 28 2827 1 -3 8/11/2006 28 2827 1 -4 Hold 2827 (1) NORMAL CYLINDER SIZE 6" X 12" AREA 28.27 sq in UNLESS NOTED ABOVE. (2) FAILURE TYPE A =CONE, B =CONE AND SPLIT C =CONE AND SHEAR D= SHEAR. E= COLUMNAR (3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS C138 C143 C172 C231 Note is report Is for the exclusive use ot the Client addressed This report may not be reproduced except in its entirety without the written consent of LE Results apply only to above tests LAWRENCE NGIINNEERING QZ L \Pro)ects \Projects 2006 \CO6 -0303 Freeport Pkwy1C06- 0303 -55 Concrete Insp Report 7 -14