ST0004(2006)-CS060404ADVANCED PAVING COMPANY
City of Coppell Freeport Parkway Repairs
TRAFFIC CONTROL PLAN
WEEK 1 thru WEEK 3 April 4 - 21
Lane Closures: Dividend to Wrangler
• Closed work area will be all of east side of median
• (both northbound lanes)
Transition: Divert northbound traffic to west side of median
1 Northbound (NB) lanes closed for work zones.
2 Transition best at Stop signs beginning at Dividend Dr
3 Northbound traffic will divert to the west side of the median for one open
northbound lane
4 Southbound traffic will continue to flow in the outside lane from Bethel Rd.
all the way to Dividend.
Lane Closures : Wrangler to Airline
• Closed work area will be all of east side of median
• Continue N.B /S.B. traffic flow on west side of median
5 One open lane of northbound traffic will continue to flow on the west side of the
median.
6 One open lane of southbound traffic will continue to flow on the west side of the
median in the outside lane
Lane Closures: Airline Dr. to Fritz Dr.
• Closed work area will be all of east side of median
• Continue N.B /S.B. traffic flow on west side of median
7 One open lane of northbound traffic will continue to flow on the west side of the
median.
8 One open lane of southbound traffic will continue to flow on the west side of the
median to the outside lane
WEEK 1 thru WEEK 3 April 4 -21"
Lane Closures: Fritz Dr. to Southwestern Dr.
• Closed work area will be all of east side of median
• Continue N.B /S.B. traffic flow on west side of median
9 One open lane of northbound traffic will continue to flow on the west side of the
median.
10 One open lane of southbound traffic will continue to flow on the west side of the
median in the outside lane
Lane Closures: Southwestern Dr. to Bethel Rd
• Closed work area will be all of east side of median
• Continue N.B /S.B. traffic flow on west side of median
11 One open lane of northbound traffic will continue to flow on the west side of the
median.
12 One open lane of southbound traffic will continue to flow on the west side of the
median in the outside lane
Minyard's Truck Gate Entrance ( Weeks 1 -3 )
• Closed work area will be all of north side of the Gate house
• Continue N.B /S.B. traffic flow on west side of median
13 Mmyard's NorthsideTruck Entrance
14 The approach of both inbound lanes will be a closed work zone
15 The south side will allow one inbound lane and one outbound lane
16 The entire northbound/ inbound turn lane for the Truck Gate will be a closed
work zone
will be closed as a work zone in Weeks 1 -3