Loading...
ST0004(2006)-CS060404ADVANCED PAVING COMPANY City of Coppell Freeport Parkway Repairs TRAFFIC CONTROL PLAN WEEK 1 thru WEEK 3 April 4 - 21 Lane Closures: Dividend to Wrangler • Closed work area will be all of east side of median • (both northbound lanes) Transition: Divert northbound traffic to west side of median 1 Northbound (NB) lanes closed for work zones. 2 Transition best at Stop signs beginning at Dividend Dr 3 Northbound traffic will divert to the west side of the median for one open northbound lane 4 Southbound traffic will continue to flow in the outside lane from Bethel Rd. all the way to Dividend. Lane Closures : Wrangler to Airline • Closed work area will be all of east side of median • Continue N.B /S.B. traffic flow on west side of median 5 One open lane of northbound traffic will continue to flow on the west side of the median. 6 One open lane of southbound traffic will continue to flow on the west side of the median in the outside lane Lane Closures: Airline Dr. to Fritz Dr. • Closed work area will be all of east side of median • Continue N.B /S.B. traffic flow on west side of median 7 One open lane of northbound traffic will continue to flow on the west side of the median. 8 One open lane of southbound traffic will continue to flow on the west side of the median to the outside lane WEEK 1 thru WEEK 3 April 4 -21" Lane Closures: Fritz Dr. to Southwestern Dr. • Closed work area will be all of east side of median • Continue N.B /S.B. traffic flow on west side of median 9 One open lane of northbound traffic will continue to flow on the west side of the median. 10 One open lane of southbound traffic will continue to flow on the west side of the median in the outside lane Lane Closures: Southwestern Dr. to Bethel Rd • Closed work area will be all of east side of median • Continue N.B /S.B. traffic flow on west side of median 11 One open lane of northbound traffic will continue to flow on the west side of the median. 12 One open lane of southbound traffic will continue to flow on the west side of the median in the outside lane Minyard's Truck Gate Entrance ( Weeks 1 -3 ) • Closed work area will be all of north side of the Gate house • Continue N.B /S.B. traffic flow on west side of median 13 Mmyard's NorthsideTruck Entrance 14 The approach of both inbound lanes will be a closed work zone 15 The south side will allow one inbound lane and one outbound lane 16 The entire northbound/ inbound turn lane for the Truck Gate will be a closed work zone will be closed as a work zone in Weeks 1 -3 u j �� ��ti v X �G\ \ S ��� s f � 3