ST0004(2006)-CS060424ADVANCED PAVING COMPANY Traffic Control Plan Outside Lanes WEEK 4 thru WEEK 6 April 24 - May 12th Lane Closures: Bethel Rd. to Southwestern Blvd. • Closed work area will be all of WEST side of median • (both SOUTHBOUND lanes) Transition: Arrow board and Type III barricades will divert Southbound traffic flow beginning at Bethel Rd. 1 Both southbound (SB) lanes /Westside of median will be closed for work zones. 2 Arrow board will transition southbound lane back at Dividend to normal side 3 Southbound traffic will now divert to the east side of the median for one open southbound lane. 4 Northbound traffic will continue to flow in the outside lane from Bethel Rd. all the way to Dividend Rd. Lane Closure: Southwestern Blvd. to Fritz Dr. • Closed work area will be all of WEST side of median • Continue N.B /S.B. traffic flow on east side of median 5 One open lane of the southbound traffic will continue to flow on the east side of the median in the inside lane 6 One open lane of northbound traffic will continue to flow on the east side of the median in the outside lane WEEK 4 thru WEEK 6 April 24 - May 12th Lane Closures: Fritz Dr. to Airline Dr. • Closed work area will be all of WEST side of median • Continue N.B /S.B. traffic flow on east side of median 7 One open lane of the southbound traffic will continue to flow on the east side of the median in the inside lane 8 One open lane of northbound traffic will continue to flow on the east side of the median in the outside lane Lane Closures: Airline Dr. to Wrangler Dr. • Closed work area will be all of WEST side of median • Continue N.B /S.B. traffic flow on east side of median 9 One open lane of the southbound traffic will continue to flow on the east side of the median in the inside lane 10 One open lane of northbound traffic will continue to flow on the east side of the median in the outside lane Lane Closures: Wrangler Dr. to Dividend Dr. • Closed work area will be all of WEST side of median • Continue N.B /S.B. traffic flow on east side of median 11 One open lane of the southbound traffic will continue to flow on the east side of the median in the inside lane. 12 One open lane of northbound traffic will continue to flow on the east side of the median in the outside lane WEEK 4 thru WEEK 6 Minyard's Truck Gate Entrance ( Weeks 1 -3 ) April 24 - May 12th • Closed work area will be all of SOUTHSIDE side of the Gate house • Continue N.B /S.B. traffic flow on east side of median 13 Close Minyard's Southside Truck Entrance 14 The approach of both outbound lanes will be a closed work zone 15 The NORTH side will now allow one inbound lane and one outbound lane s t P 1 �2 L CIO ROAD T o WORK I AHEAD 160' CLOSED LANE T 160' 245' cwn �a drvlCrs) Co tlonoO 00000 � � Suffer 90%fosory For Soou evrrr4ght dos rrs. 100 ft. ... . . ...... ........ �G BUYERS BARRICADES, INC- . STEVE U 1535 -393V o ■1 g0000 Arrow panel w i or troller ■ ■ ■ ChanneliZing devices r Dlrectlon of traffic i Sign (facing down) ® Work space ■ Work vehlcle ■ ■ ■ 004 AA ■ ■ ■ ■ ■ A ■ ■ Yufirr Spacr ■ ■ ■ ■ y.1y -N. g0000 Arrow panel Arrow display support or troller ■ ■ ■ ChanneliZing devices Dlrectlon of traffic i Sign (facing down) ® Work space Work vehlcle (optional) 00000) Nurdatary for ovelr110F1S CDSYr 245 cm. s3 devices 16*CL OSED ' LEFT ROAD V WORK AHEAD 5 ww 1960 f Nd cv Pat A 1996 rep $m DETA TC -1 (151 n TF IM. UJ Z LL LL LL LL LL LL LL LL LL LL Li NN� CNMC LL LL LL LL. LL. LL LL LL LL 4,; �t y tntntON NRN N N N N f- Ln v 14 T tl W W W W W W W W W U U U U U U U U U Z Z Z Z z Z Z Z Z 000000000 U U U 0 U U U U U J N C N N N N N CA k � 1 r. r Z W 0 Q Or LL- Z w 02 LJ U �a J W � mw J x J W a O 2 V) W a m W a �r Qr Cl a w V) �a (n 4J � Q O w Z� a a J d W W U � �O - O cD O N d' O N ; N O O O O O c N O O co 0 'O O O N ' O \ o -L O r�� CA k � 1 r. r Z W 0 Q Or LL- Z w 02 LJ U �a J W � mw J x J W a O 2 V) W a m W a �r Qr Cl a w V) �a (n 4J � Q O w Z� a a J d W W U � �O - O cD O N d' O N ; N O O O O O c N O O co 0 'O O O N ' O \ o -L O r��