Loading...
DR9801-LR 990319 GEOTI~CHNICA[ AND I~ R I--I II p FNVIRONMENTAi CONSULTANTS CONCRETE CYLINDER TEST RE. PORT Drainage and Paving Improvements Fritz and Freeport Parkway Coppell, Texas REPORTED TO: Catellus Development Corporation REPORT NO. 18 4545 Fuller Drive, Suite 100 REG PROJECT NO. 4998 Irving Texas 75038 SAMPLE DATE: 03-19-99 A'I'TN: Mr. Robert McCann TECHNICIAN: L. T. Edwards CONTRACTOR: Wright Construction Location of Sample Design Information I Lattimo[e 168 4200 I Test Results 1 1203 03-26-99 7 130950 4630 1203 04-16-99 28 1203 04-16-99 28 1203 Hold Cylinder Data Distribution: (1) Catellus Development Corporation/ Submitted by: Mr. Robert McCann (1) Wright Construction/Mr. Tim Mullikin REED ENGINEERING GROUP, INC. (1) City of Coppell/Mr. Garth Campbell (1) Halff Associates/Mr. Todd Jackson Original Signed By Keith E. Atkins KEA/sa/rt 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019