DR9801-LR 990319 GEOTI~CHNICA[ AND I~ R I--I II p
FNVIRONMENTAi CONSULTANTS
CONCRETE CYLINDER TEST RE. PORT
Drainage and Paving Improvements
Fritz and Freeport Parkway
Coppell, Texas
REPORTED TO: Catellus Development Corporation REPORT NO. 18
4545 Fuller Drive, Suite 100 REG PROJECT NO. 4998
Irving Texas 75038 SAMPLE DATE: 03-19-99
A'I'TN: Mr. Robert McCann TECHNICIAN: L. T. Edwards
CONTRACTOR: Wright Construction
Location of Sample
Design Information
I Lattimo[e 168 4200 I
Test Results
1 1203 03-26-99 7 130950 4630
1203 04-16-99 28
1203 04-16-99 28
1203 Hold
Cylinder Data
Distribution: (1) Catellus Development Corporation/ Submitted by:
Mr. Robert McCann
(1) Wright Construction/Mr. Tim Mullikin REED ENGINEERING GROUP, INC.
(1) City of Coppell/Mr. Garth Campbell
(1) Halff Associates/Mr. Todd Jackson Original Signed By
Keith E. Atkins
KEA/sa/rt
2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 · TEL [214] 350 5600 · FAX [214] 350 0019