Loading...
Gateway BP(1.4)-PT061013T H E C 1 T Y OF COPPELL ti 0 CONSTRUCTION DEVELOPMENT PERMIT APPLICATION 1 Name of Applicant. Hi ll Wi 1 ki nson, Ltd. Date Submitted: 10/16/06 Address of Applicant 800 Klein Road, Ste 100, Plano, TX 75074 Phone Number: (214) 299 -4300 FAX NUMBER: (214) 299 -4443 2 Location of Construction (address, if available): Coppell, TX 75019 #2 1R Subdivision Section Block Lot OR 770 Gateway Blvd. 2.07 Acres Survey /Abstract Acreage Location description (attach vtcutity map) Map Attached Page 5 3 Type of proposed construction or development• Residential Alteration of a natural waterway drainage course Non- residential (X) Other (describe attach drawing or sketch) (Trailer Parki ng Lot) Placement of Fill (in nght -of -way or on pnvate property) 4. Description of Construction Permit requested: (X) Paving(Trai 1 er Prki ng i Median or Landscaping Box Culvert Sidewalk Vti ater Main Rip Rap Drive Approach R C.P Fill Area E'cal ation Sanitary Sewer Main Drainage Channel Excavation Fire Lane Flume Slope Protection/Retaining Wall Bridge inlet Parking Lot -Y.- Please provide the name, address and 24 hour phone number for supervisor of ever, contractor working under this general permit 5 All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control Sedimentation Ordinance. 6 Applicant shall provide a copy of approved plans, specifications and related cost estimate or contract of the proposed construction for the purpose of permit fee calculations. Pc(Z-4 DAM Ctty In pector Contact Number(s) Is additional information required? Are other federal, state, or local permits requires? ONSTRI CTION DEVELOPMENT PERMIT APPLICATION Page 2 7 A Construction Permit Fee in accordance with the City of Coppell Fee Ordinance shall be paid prior to beginning work Amount Due: $7,969.42 Date Paid- 10/10106 NOTE A separate excavation permit is required anytune pavement is cut or when there is work in the right -of -way not approved by the City Engineer Any work requiring closing of a lane of traffic, street, or alley must be approved by the Engineering Dept. with notification to the following prior to closing: Police Department 972 304 -3600 Fire Department 972 -304 -3500 Street Department 972- 304 -3546 Engineering Department 0 972 3043679 Attach barricade plan trench safety plan of a lane or street closure. (Required) Note Street closures are allowed from 9.00 a.m. until 3 00 p.m. ONLY unless otherwise approved by City Engineer A pre- construction meeting is required prior to beginning work related to this permit. Contact the inspector to schedule meeting. (214) 542 -1597 Signa re of Applicant Panted Name Contact Number 972/ 3c4 FOR CITY USE ONLY Is the fill area located in an identified flood hazard area? YES (X) NO If YES, then a Floodplain Development Permit is required before any construction can begin YES YES PERMIT APPLICATION APPROVED PERMIT APPLICATION DENIED City Approval Date NO ()NC) Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against u by reason of or rf any way arising out of the closure, blocking, excavating, cutting, funneling, or other work by the applicant under permit from the City, if such permit is granted. c 0 c) E 2g L n 0 3 ce R N y vi 0 SI aA N 1. co c W c:: d o La co 0 a v� CD P a) OA p "v a 4 v y o W C W W 0 uz Q S E G Z CZ C) O a) 0 H ,o� �y cr -ft T N el a> c li t4 Q .7a y y w L..) v `n C c4 b W C. w p. cL, a. 0 C v •A il q 4 a) Q i m H L d CO) a v; E"" p 0 7"+ n. o CA U v o 0� CD L IA o 0 ....-c'4 f e) ,n eV 'U cd v N VI 10 0 o r 4 o� U a) v) W O O O a. O V L) DB d) G, E U i.. 6 0 Q W 0 v CO r H [LL WILKINSON, LTD. (icncral Contractors DESCRIPTION 1 EARTHWORK 2 LANDSCAPE AND IRRIGATION 3 SITE UTILITY 4 TURNKEY CONCRETE 5 MISCELLANEOUS CONCRETE 6 SITE SPECIALTIES 7 LABORATORY TESTING SERVICES ALLOWANCE 8 CAULKING SEALANTS 9 DOCK EQUIPMENT 10 ELECTRICAL 11 12 SUBTOTAL Haverty's Trailer Parking Expansion Dallas Distribution Facility 05/25/06 Budget 102,000 SF TOTAL 36,845 1,218 18,407 316,274 3,786 11,124 6,000 4,816 NA COST /SF 0 36 001 0 18 3 10 0 04 0 11 0 06 0 05 0 09 6f1fi 4 00 09 1 JOB NUMBER COST CODE AREA AMOUNT DESCRIPTION 1 GEN LED 1 DEPT 14-2155 20124 969 4' Inspection Fees 1 I 1 1 1 i _L____ 1 1 1 1 1 I I PAY CASK RECEIPT 0 1 i o H LL 8 '1 1 4d, 77 0 G- v D 10mo :1 Ai s•C 14- cz 0 y\isee--e-T70Ai L-Ke a Ch 0_ in 0 (NJ TO THE ORDER OF HILL WILKINSON, LTD. PLANO, TX 75074 79b49.Li24, HILL &WILKINSON, LTD. GENERAL CONTRACTORS 800 KLEIN ROAD, SUITE 100 PLANO, TEXAS 75074 (214) 299-4300 City of Coppell TI-1E 71:0),,71-) PLEASE DETACH BEFORE DEPOSITING LEGACY TEXAS BANK 88-123/1119 07 3 306 No 070116 No 070116 DATE 10/09/06 AMOUNT 7,969.42 HILL WILKINSON, LTD. Two Signatures Required For Amounts Over $10,000.00 77(1 Gatew, ay Blvd, Coppell, TX Google Maps Go� Address 770 Gateway Blvd Coppell, TX 75019 Page 1 of 1 http /'maps google com /maps map &q 770 +Gateway +Blvd, +Coppell, +TX 10/9/2006