Gateway BP(1.4)-PT061013T H E C 1 T Y OF
COPPELL
ti 0
CONSTRUCTION DEVELOPMENT PERMIT APPLICATION
1 Name of Applicant. Hi ll Wi 1 ki nson, Ltd. Date Submitted: 10/16/06
Address of Applicant 800 Klein Road, Ste 100, Plano, TX 75074
Phone Number: (214) 299 -4300 FAX NUMBER: (214) 299 -4443
2 Location of Construction (address, if available):
Coppell, TX 75019 #2 1R
Subdivision Section Block Lot
OR
770 Gateway Blvd.
2.07 Acres
Survey /Abstract Acreage
Location description (attach vtcutity map) Map Attached Page 5
3 Type of proposed construction or development•
Residential Alteration of a natural waterway drainage course
Non- residential (X) Other (describe attach drawing or sketch) (Trailer Parki ng Lot)
Placement of Fill (in nght -of -way or on pnvate property)
4. Description of Construction Permit requested:
(X) Paving(Trai 1 er Prki ng i Median or Landscaping Box Culvert
Sidewalk Vti ater Main Rip Rap
Drive Approach R C.P Fill Area
E'cal ation Sanitary Sewer Main Drainage Channel Excavation
Fire Lane Flume Slope Protection/Retaining Wall
Bridge inlet Parking Lot
-Y.- Please provide the name, address and 24 hour phone number for supervisor of ever,
contractor working under this general permit
5 All construction shall be in compliance with, but not limited to, the City of Coppell
Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved
plans. The contractors shall adhere to the City's Erosion Control Sedimentation Ordinance.
6 Applicant shall provide a copy of approved plans, specifications and related cost estimate
or contract of the proposed construction for the purpose of permit fee calculations.
Pc(Z-4 DAM
Ctty In pector
Contact Number(s)
Is additional information required?
Are other federal, state, or local permits requires?
ONSTRI CTION DEVELOPMENT PERMIT APPLICATION Page 2
7 A Construction Permit Fee in accordance with the City of Coppell Fee Ordinance shall be
paid prior to beginning work
Amount Due: $7,969.42 Date Paid- 10/10106
NOTE A separate excavation permit is required anytune pavement is cut or when there
is work in the right -of -way not approved by the City Engineer
Any work requiring closing of a lane of traffic, street, or alley must be approved by the
Engineering Dept. with notification to the following prior to closing:
Police Department 972 304 -3600
Fire Department 972 -304 -3500
Street Department 972- 304 -3546
Engineering Department 0 972 3043679
Attach barricade plan trench safety plan of a lane or street closure. (Required)
Note Street closures are allowed from 9.00 a.m. until 3 00 p.m. ONLY unless otherwise
approved by City Engineer
A pre- construction meeting is required prior to beginning work related to this permit. Contact
the inspector to schedule meeting.
(214) 542 -1597
Signa re of Applicant Panted Name Contact Number
972/ 3c4
FOR CITY USE ONLY
Is the fill area located in an identified flood hazard area? YES (X) NO
If YES, then a Floodplain Development Permit is required before any construction can begin
YES
YES
PERMIT APPLICATION APPROVED PERMIT APPLICATION DENIED
City Approval Date
NO
()NC)
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand
or cause of action that may be made or come against u by reason of or rf any way arising out of the closure,
blocking, excavating, cutting, funneling, or other work by the applicant under permit from the City, if such
permit is granted.
c
0 c) E
2g
L n 0 3
ce R
N y vi 0 SI
aA N 1. co c W c:: d o
La co 0 a v�
CD P a)
OA
p "v a 4
v y o
W C
W W 0
uz
Q S E G
Z CZ C) O
a)
0 H ,o� �y
cr -ft T N el a> c li
t4
Q .7a y y
w L..) v `n C c4 b
W C. w p. cL, a. 0 C v •A
il q
4 a) Q i m
H L d
CO) a v; E""
p 0 7"+ n. o
CA U v
o 0� CD L
IA o 0 ....-c'4 f
e) ,n
eV 'U cd v
N
VI 10 0 o
r
4
o�
U a) v)
W O
O O
a. O V
L) DB d) G,
E U
i.. 6 0
Q W 0 v
CO
r
H [LL WILKINSON, LTD.
(icncral Contractors
DESCRIPTION
1 EARTHWORK
2 LANDSCAPE AND IRRIGATION
3 SITE UTILITY
4 TURNKEY CONCRETE
5 MISCELLANEOUS CONCRETE
6 SITE SPECIALTIES
7 LABORATORY TESTING SERVICES ALLOWANCE
8 CAULKING SEALANTS
9 DOCK EQUIPMENT
10 ELECTRICAL
11
12
SUBTOTAL
Haverty's
Trailer Parking Expansion
Dallas Distribution Facility
05/25/06
Budget
102,000 SF
TOTAL
36,845
1,218
18,407
316,274
3,786
11,124
6,000
4,816
NA
COST /SF
0 36
001
0 18
3 10
0 04
0 11
0 06
0 05
0 09
6f1fi 4 00
09 1
JOB
NUMBER
COST CODE
AREA
AMOUNT
DESCRIPTION
1
GEN LED 1
DEPT
14-2155
20124
969
4'
Inspection Fees
1
I
1
1
1
i
_L____
1
1
1
1
1
I
I
PAY
CASK
RECEIPT 0 1 i o
H LL
8 '1 1 4d, 77 0 G- v D
10mo :1 Ai s•C 14-
cz
0
y\isee--e-T70Ai L-Ke
a Ch
0_
in
0
(NJ
TO THE ORDER OF
HILL WILKINSON, LTD. PLANO, TX 75074
79b49.Li24,
HILL &WILKINSON, LTD.
GENERAL CONTRACTORS
800 KLEIN ROAD, SUITE 100 PLANO, TEXAS 75074
(214) 299-4300
City of Coppell
TI-1E 71:0),,71-)
PLEASE DETACH BEFORE DEPOSITING
LEGACY TEXAS BANK 88-123/1119
07 3 306
No 070116
No 070116
DATE 10/09/06 AMOUNT
7,969.42
HILL WILKINSON, LTD.
Two Signatures Required For Amounts Over $10,000.00
77(1 Gatew, ay Blvd, Coppell, TX Google Maps
Go�
Address 770 Gateway Blvd
Coppell, TX 75019
Page 1 of 1
http /'maps google com /maps map &q 770 +Gateway +Blvd, +Coppell, +TX 10/9/2006