Loading...
SS9901-LR060316C T Construction Materials Testing and Environmental Consulting '�'exas CMT Inc. 10044 Monroe Drive 9 Dallas, Texas 75229 (214) 352 -6957 Fax (214) 352 -6972 0 www.texascmt.com REPORT OF CONCRETE MIX OBSERVATION Report Date March 16, 2006 Date Concrete Placed: March 9, 2006 Standard 6 "x 12" Client: City of COppell Area 28.27 Square Inches Project. DeForest & Sandy Lake Wastewater Concrete Report No. 28 Lift Stations Project SS 99 -01 C olrtractor Can -Fer Construction Project No.. 205 -0126 Concrete Supplier and Plant Southern Star 27 Location of Placement: Paving MATERIALS Source/ SSD Batch Wis. OBSERVATION DATA Description (Lbs/CuYd) Mix Number 7503 Time Sample Batched: 10:38 am Date Tested Time Sampled: 11.28 am C ement Sample Location. NE corner of small building, SW corner of FI Ash y 03/16/06 building - sidewalk L oarse Aggregate Truck/TicketNo 931/1052603 Intermediate Aggregate Temperature: 04/06/06 Fine Aggregate Ambient Range. 67oF DLS 108 Concrete Range 75 °F admixtures Slump Range (inches): 2V' 1 Weather Conditions: Clear 2 Time Started: 1000 am Added Water 0 gallons Time Completed. 12.30 pm Fracture Regular Sample Air Content ( %): 4% Unless Noted Otherwise Total Cubic Yards Placed. 8 R—ni —i Ctrencth (I he /cn in 1 4000 Specimen Number Measured Slum (in. ) Age (Days Date Tested Total Load Lbs. Compressive Strength Lbs JSq In Remarks DLS 106 7 03/16/06 133,940 4,740 DLS 107 28 04/06/06 DLS 108 2 z „ 28 04/06/06 DLS 109 H HOLD I est Methods Utilized Fracture Regular Cylinders Made By AB ASTM C I I,C -39,17-143 Unless Noted Otherwise Remarks and /or Distribution. cc Mr Rick O'Dell - City of Coppell Mr Todd C Hoff - Canfer Construction Co. Ms. Erika K. Cooper - Turner Collie & Braden Texas CMT Inc Reviewed by � \ 411 letters :md reports are for the exclusive use of the client to whom thew are addressed and shall not be reproduced without the full approval of Texas CMT Inc. The use of our name must receive our prior written approval. Our letters and reports apph onto to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or sinular products. Ib T\ Construction Materials Testing and Environmental Consulting Texas CMT Inc. 10044 Monroe Drive Dallas, Texas 75229 (214) 352 -6957 Fax (214) 352.6972 www.texascmt.com REPORT OF IN -PLACE DENSITY AND MOISTURE OF SOIL - f- 1n innc nine AA -+t, -A AQ'r%A T11011 T12n17 nAG2 pnoP t of t Client: City of Coppell Material Description Maximum Optimum Dry Moisture Density Content Project: DeForest Lift Station - Coppell (Lbs/CuFt) Percent Test Date March 15, 2006 1. Brown sand 95.3 22.5 2. Dark Brown Clay T Report Date March 16, 2006 Required Density ( %)• Min. 95% -100 %; Site fill: Min. 90% Required Moisture (%): Opt. t3% -Sand; Opt. +4% -Clay; Opt. t2% -Lime Treated; Opt. +5 under paving Mat Location/Elevation (and/or) Lift In -Place In -Place Percent No. Dry Density Moisture Compaction Test (Lbs /CuFt) Content ( %) Probe No. Depth 1 Final 22 Center of old lift station 106.2 18.4 98.9 6" Test results meet project specifications cc Mr Rick O'Dell - City of Coppell Mr Todd C Hoff - Canfer Construction Co. Ms Erika K. Cooper - Turner Collie & Braden e r�u luucr. uuJ rclvx r.:uch:r the c�ivai.r u.c ol'nc� chrnito whomlhe rc ddru.sul.'rhe uw"four name muvl ra:ei.e our pnrrc wrilkm �pp,..] Or Wmry and rq M,. ppIr nnhv w the —pic t,,t,d unJ/uroMcnxd, and,w nut ­.v nIV ind -tu �I liic yu:unitic. ul appmr 1, A-1-1 :x ­il., pnx .-