ST9902-LR061012
Daily Report of In-Field Sieve Analysis
.. eMJ ENGINEERING, INC.
7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993
Client:
Project:
City of Coppel!
West Sandy Lake Road
Reconstruction
Report Distribution: City of Coppell (2)
Tiseo Paving Company
Teague Nail & Perkins
CMJ Report No: 687-5192-157
Date Tested: October 12, 2006
Technician: Jory Goldring
Test
No.
In-Field Sieve Anal sis of Road Mixed Materials TEX 101 E
Percent
Passing
1-3/4" Sieve
Test Location
(Paving Subgrade)
Percent
Passing
#4 Sieve
1
2
3
4
Cement-Treated Paving Subgrade
Sand Lake Rd, Westbound Lane
Sta. 43+00, North Half
Sta. 45+00, South Half
Sta. 47+00, Centerline
Sta. 49+00, North Half
100%
100%
100%
100%
81%
85%
83%
87%
100%
80%
CMJ Engineering, Inc.
R Carl Lee, S T.
ce President/CMT Manager
The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test
results do not pertain to any other samples, items, or areas regardless of similarity Our reports are produced solely for the
exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client
and CMJ Engineering, Inc.