Loading...
ST9902-LR061012 (2) Daily Report of In-Field Sieve Analysis -e eM} ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppel! West Sandy Lake Road Reconstruction Report Distribution. City of Coppell (2) Tiseo Paving Company Teague Nail & Perkins CMJ Report No.: 687-5192-156 Date Tested: October 12, 2006 Technician Jory Goldring Test No. In-Field Sieve Anal sis of Road Mixed Materials TEX 101 E Percent Passing 1-3/4" Sieve Test Location (Paving Subgrade) Percent Passing #4 Sieve Lime-Treated Paving Subgrade Sand Lake Rd, Westbound Lane 1 Sta. 28+00, Centerline 2 Sta. 30+50, North Half 3 Sta. 33+00, South Half 4 Sta. 36+50, Centerline 5 Sta. 39+00, North Half 6 Sta. 41 +50, South Half 100% 67% 100% 73% 100% 65% 100% 74% 100% 78% 100% 76% 100% 60% CMJ Engineering, Inc. R Carl Lee, SET Vice President/CMT Manager The test results presented in this report apply only to the specific samples, Items, and areas described within this report. The test results do not pertain to any other samples, items, or areas regardless of similarity Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc.