Loading...
ST9902-LR061017 (2) In-Place Soil Moisture/Density Tests by Nuclear Method eM J ENGINEERING, INC 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-154 Report Date: 10/17/2006 Specifications Percent Compaction: +95% min Moisture Content: opt -2% to +4% Test Data Date Tested: 10/12/2006 Technician: Jory Goldring Material Description Light Brown Sandy Clay (Lime Treated) Light Gray Sandy Clay Lime Treated Lime Treated Light Brown Sandy Clay Brown and Reddish Brown Silty Clay wIG ravel Optimum Maximum Dry Moisture % Density pcf Curve No. Test Method 2675 ASTM D-698 2707 ASTM D-698 2682 ASTM D-698 2909 ASTM D-698 17.0 105.5 22.5 94.0 16.0 99.5 17.5 107.5 In-Place Test Results Test Elevation Ref. Probe No or Lift Location Curve Depth Stabilized Paving Subgrade** 287.0 Final Sta. 26+00, Centerline 2675 6" 288.0 Final Sta. 23+50, North Half 2707 6" 289.0 Final Sta. 21+00, South Half 2675 6" 290.0 Final Sta. 18+50, Centerline 2682 6" 291.0 Final Sta. 16+00, North Half 2707 6" 292.0 Final Sta. 13+50, South Half 2707 6" 293.0 Final Sta. 11 +00, Centerline 2707 6" 294.0 Final Sta. 8+50, North Half 2707 6" 295.0 Final Sta. 6+00, South Half 2707 6" 296.0 Final Sta. 4+50, Centerline 2707 6" 297.0 Final Sta. 50+00, North Half 2909 6" 298.0 Final Sta. 52+00, South Half 2909 6" Percent Wet Density Dry Density Percent Moisture (pcf) (pcf) Density 21.0 121.8 100.7 95.5 25.3 115.5 92.2 98.1 18.7 123.3 103.9 98.5 16.8 115.6 99.0 99.5 24.3 115.1 92.6 98.5 25.1 115.0 91.9 97.8 22.8 115.3 93.9 99.9 23.9 115.8 93.5 99.5 25.2 113.4 90.6 96.4 22.8 116.0 94.5 100.5 16.1 125.6 108.2 100.7 16.3 119.9 103.1 95.9 Test results on this report meet project specification. Test Method(s): ASTM D2922, ASTM D3017 Gauge: Humboldt Gauge SN: 4953 Std. Density Count: 3781 Additional Remark(s): ** Stabilized Paving Subgrade - Westbound Lane CMJ Engineering, Inc R. Carl Lee, SET. - ~ Vice President/CMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and ar as described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced s lely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of ou client and CMJ Engineering, Inc. 07 Page 1 of 1