Loading...
ST9902-LR061016 Moisture-Density Relationship eM J ENGINEERING, INC 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppel! West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-152 Report Date: 10/16/2006 Project Information Material Origin: Sample Location: Material Description: Material Use: On Site West bound Sandy Lake Rd Sta#49+50 Brown and Reddish Brown Silty Clay w/Gravel Cement Treated Subgrade Moisture-Density Relationship - Curve No. 2909 Tested By: Shawn Wood, P.G. Sample Date: 10/11/2006 102 \ 100% ~ ~turaJ 'on (no, b7m \ -- - f-- - f- \ ~ ,f I "'- \ \. 1/ I \ " V ! ~ 1\ J I I \ , 1\ IJ, : \ j I \ \ I : \ \ \ 13 15 17 19 21 23 25 Moisture Content (%) Material Properties and Test Information - Curve No. 2909 110 108 Dry Density (pc!) 106 104 Maximum Dry Density: Optimum Moisture Percent: Test Method(s): ASTM D-698 Rammer Description: Mechanical Preparation Procedure: Moist CMJ Engineering, Inc R. Carl Lee, SET. \ / Vice PresidenVCMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, it~s, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 06 Page 1 of 1