ST9902-LR061016
Moisture-Density Relationship
eM J ENGINEERING, INC
7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993
Client:
Project:
City of Coppel!
West Sandy Lake Road
Reconstruction
Report Distribution: (1) City of Coppell
(1) City of Coppell
(1) Tiseo Paving Company
(1) Teague Nail & Perkins
CMJ Report No.: 687-5192-152
Report Date: 10/16/2006
Project Information
Material Origin:
Sample Location:
Material Description:
Material Use:
On Site
West bound Sandy Lake Rd Sta#49+50
Brown and Reddish Brown Silty Clay w/Gravel
Cement Treated Subgrade
Moisture-Density Relationship - Curve No. 2909
Tested By: Shawn Wood, P.G.
Sample Date: 10/11/2006
102
\ 100% ~ ~turaJ 'on
(no, b7m
\
-- - f-- - f- \
~
,f I "'- \
\.
1/ I \ "
V ! ~ 1\
J
I I \ ,
1\
IJ, : \
j I \ \
I : \ \
\
13 15 17 19 21 23 25
Moisture Content (%)
Material Properties and Test Information - Curve No. 2909
110
108
Dry
Density
(pc!)
106
104
Maximum Dry Density:
Optimum Moisture Percent:
Test Method(s):
ASTM D-698
Rammer Description:
Mechanical
Preparation Procedure: Moist
CMJ Engineering, Inc R. Carl Lee, SET.
\ / Vice PresidenVCMT Manager
LIMITATIONS: The test results presented in this report apply only to the specific samples, it~s, and areas described within this report. The test results
do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our
client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc.
06 Page 1 of 1