Loading...
ST9902-LR061013 Concrete Compression Test Report eM J ENGINEERING, INC 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-143 Report Date: 10/13/2006 Strength Slump Air Content Concrete Temperature Ambient Temperature Specifications 3600 psi @ 28 Days 5 in max Test Data 3 % min 6 % max n/a 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method 09/13/2006 Joshua Davis Sunny/Breezy Redi-Mix/732 ASTM C231 Sample Location: 175229 Time Batched: 10:40 Time Sampled: 11 :20 3.25 in Air Content: 3.6 % Unit Weight: n/a 880 F Ambient Temperature: 780 F Yardage (c.y.): 10 of 20 Stamped Concrete Crosswalks, Eastbound Sandy Lake Road at Royal Lane, Northbound and Southbound Walks Southbound ~ Ticket Number: Slump: Concrete Temperature: Placement Location: Concrete Compression Test Results Cylinder Age Max Load Area Strenijth Fracture Set# # Test Date (days) (Ibs. force) (sq.in.) (pSI Type 01 SLR09130601 09/18/2006 5 104920 28.09 3740 C-cone/shear 01 SLR09130602 09/20/2006 7 121360 27.99 4330 E-columnar 01 SLR09130603 10/11/2006 28 138300 27.99 0,940 C-cone/shear 01 SLR09130604 10/11/2006 28 141630 27.99 ~60 E-columnar 01 SLR09130605 Hold 28 day average 5000 Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. Additional Remarks: Red Dye Added to Mix at Job Site 5-day Break Requested by John Gay with Tiseo Paving o Gallons of Water Added 0 pie ~ AJ · ~M~'E~i~9 R. Carl Lee, SET. Vice President/CMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Page 1 of]