Loading...
ST9902-LR060929 (2) Concrete Compression Test Report eM J ENGINEERING, INC 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-136 Report Date: 09/29/2006 Strength Slump Air Content Concrete Temperature Ambient Temperature Specifications Test Data 08/30/2006 Robert Dunnam Clear/Light Wind Tiseo/2465H ASTM C231 3600 psi @ 28 Days 5 in max 3 % min 6 % max n/a 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: 165/33 Time Batched: 07:28 Time Sampled: 07:45 1.5 in Air Content: 3.0 % Unit Weight: N/A 890 F Ambient Temperature: 77" F Yardage (c.y.): 30/250 Paving: Eastbound Sandy Lake Road from Station 11 +50 to Station 12+56 and Royal Lane northbound from Station 1 +00 to Station 2+00 Station 11 + 75 on Sandy Lake Road Concrete Compression Test Results Cylinder Age Max Load Area Stren8th Fracture Set # # Test Date (days) (Ibs. force) (sq.in.) (pSI Type 01 SLR08300601 09/05/2006 6 112900 28.18 4010 E-columnar 01 SLR08300602 09/06/2006 7 113600 27.99 4060 E-columnar 01 SLR08300603 09/27/2006 28 144240 28.18 5120 E-columnar 01 SLR08300604 09/27/2006 28 139340 28.18 4940 E-columnar 01 SLR08300605 Hold 28 day average 5030 Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. 10 gallons of water added on site, approved by John Gay **REVISED REPORT 9/12/2006** Concrete temperature specification removed. Ambient temperature specification revised to remove maximum temperature. **REVISED REPORT 9/18/2006** Slump specification changed from 4" Max to 5" Max CMJ Engineering, In R. Carl Lee, SET. Vice PresidenVCMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, ite s, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Page I of2 Concrete Compression Test Report eM J ENGINEERING, INC 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppel! (1) City of Coppel! (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-136 Report Date: 09/29/2006 n/a 40. F min Placement Date Sampled By Weather Supplier/Mix Air Content Method Test Data 08/30/2006 Robert Dunnam Clear/Light Wind Tiseo/2465H ASTM C231 Strength Slump Air Content Concrete Temperature Ambient Temperature Specifications 3600 psi @ 28 Days 5 in max 3 % min 6 % max Ticket Number: Slump: Concrete Temperature: Placement Location: 161/47 Time Batched: 11:21 Time Sampled: 11:40 4 in Air Content: 4.2 % Unit Weight: N/A 900 F AmbientTemperature: 810 F Yardage (c.y.): 160/250 Paving: Sandy Lake Road eastbound at north point, northbound Station 1 +00 to Station 1 +42 Sample Location: Station 1 +30 on Royal Lane Concrete Compression Test Results Cylinder Age Max Load Area Strenijth Fracture Set # # Test Date (days) (Ibs. force) (sq.in.) (pSI Type 02 SLR08300606 09/05/2006 6 85320 28.18 3030 C-cone/shear 02 SLR08300607 09/06/2006 7 72680 27.99 2600 E-columnar 02 SLR08300608 09/27/2006 28 104300 28.18 3700 E-columnar 02 SLR08300609 09/2712006 28 102740 28.18 3650 E-columnar 02 SLR08300610 Hold 28 day average 3680 Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. o gallons of water added on site **REVISED REPORT 9/12/2006** Concrete temperature specification removed. Ambient temperature specification revised to remove maximum temperature. **REVISED REPORT 9/18/2006** Slump specification changed from 4" Max to 5" Max CMJ Engineering, I R. Carl Lee, S.E.T. Vice PresidenVCMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Page 2 of2