Loading...
ST9902-LR060928 (2) Concrr Compression Test Report eM J ENGINEERING, INC 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppel! West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-131 Report Date: 09/28/2006 Strength Slump Air Content Concrete Temperature Ambient Temperature Specifications Test Data 08/25/2006 Robert McElvany Clear/Light Breeze Southern Star/9618 ASTM C231 3600 psi @ 28 Days 4 in max 3 % min 6 % max n/a 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: 1463387 Time Batched: 09:58 3 in Air Content: 3.0 % 900 F Ambient Temperature: 900 F Inlets: Sandy Lake Road, Sta. 0+13.88 and Sta. 0+66.08 Time Sampled: 10:30 Unit Weight: n/a Yardage (c.y.): 10 of 10 Same Concrete Compression Test Results Cylinder Age Max Load Area Strenijth Fracture Set# # Test Date (days) (Ibs. force) (sq.in.) (pSI Type 01 SLR08250601 09/01/2006 7 116040 28.09 4130 C-cone/shear 01 SLR08250602 09/22/2006 28 158120 27.99 ~650 E-columnar 01 SLR08250603 09/22/2006 28 154920 27.99 U30 E-columnar 01 SLR08250604 Hold 28 day average 5590 Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. o Gallons of Water Added On-Site **REVISED REPORT 9/12/2006** . Strength specification changed from 3000 to 3600 (it Concrete temperature specification removed I ce Ambient temperature specification revised to remove maximum temperature. /Irzf/rr CMJ Engineeri R. Carl Lee, SET. Vice PresidenVCMT Manager LIMITATIONS: The test results presented in this report apply only to the specific sam es, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our re are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. O! Page 1 of 1