ST9902-LR060822 (2)
HMAC Density Test Report
__ eM} ENGINEERING, INe.
7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993
Client:
Project:
City of Coppell
West Sandy Lake Road
Reconstruction
Report Distribution: City of Coppell (2)
Tiseo Paving Company
Teague Nail & Perkins
CMJ Report No.: 687-5192-126
Date Tested: August 22,2006
Technician: Jory Goldring
Specifications: Percent Compaction: 91-95
Material Description: Tvpe "B" Target Weight: 159.7
1
2
3
4
5
6
Sandy Lake Road, Eastbound Lane
Sta.4+20, First 3" Lift, Right Half
Sta. 6+20, First 3" Lift, Left Half
Sta. 9+70, First 3" Lift, Right Half
Sta. 4+60, Final 3" Lift, Left Half
Sta. 6+90, Final 3" Lift, Right Half
Sta.9+10, Final 3" Lift, Left Half
151.4
146.3
147.9
149.6
146.9
146.3
94.8
91.6
92.6
93.7
92.0
91.6
CPN 1 6660
58975
9763
CMJ Engineering, Inc.
R. Carl Lee, S. .T.
Vice President/CMT Manager
The test results presented in this report apply only to the specific samples, items, and areas described within this report. The
test results do not pertain to any other samples, items, or areas regardless of similarity. Our reports are produced solely for the
exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our
client and CMJ Engineering, Inc.