Loading...
ST9902-LR060925 (2) Concre..... Compression Test Report C M J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-125 Report Date: 09/25/2006 Specifications Test Data Strength Slump Air Content Concrete Temperature Ambient Temperature 3600 psi @ 28 Days 4 in max 3 % min 6 % max n/a 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method 08/21/2006 Zach Hartgraves HoVCalm Southem Star/9618-B ASTM C231 Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: 1258180 Time Batched: 13:20 4 in Air Content: 5.0 % 890 F Ambient Temperature: 97" F Storm drain inlet - Sandy Lake Road, east lane, Storm Drain section B-1 Time Sampled: 14:10 Unit Weight: N/A Yardage (c.y.): 6/6 Same as above Concrete Compression Test Results Cylinder Age Max Load Area Strenijth Fracture Set# # Test Date (days) (Ibs. force) (sq.in.) (pSI Type 01 SLR0821 0601 08/28/2006 7 94640 28.18 3360 C-cone/shear 01 SLR0821 0602 09/18/2006 28 116760 28.09 4160 E-columnar 01 SLR0821 0603 09/18/2006 28 113060 28.09 4020 C-cone/shear 01 SLR0821 0604 Hold 28 day average 4090 Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. o gallons of water added on site **REVISED REPORT 9/12/2006** Strength specification changed from 3000 to 3600 Concrete temperature specification removed Ambient temperature specification revised to remove maximum temperature. CMJ Engineering, fn,c LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Page 1 of 1