Loading...
ST9902-LR060922 Concreto Compression Test Report eM J ENGINEERING, INC 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: City of Coppell ~ Report Distribution: Project: West Sandy Lake Roa Reconstruction (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-124 Report Date: 09/22/2006 Strength Slump Air Content Specifications 3600 psi @ 28 Days 4 in max 3 % min 6 % max n/a Test Data Concrete Temperature Ambient Temperature 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method 08/18/2006 Zach Hartgraves Clear/Sunny Southern Star/9618B ASTM C231 Ticket Number: Slump: Concrete Temperature: Placement Location: 1258132 Time Batched: 13:30 Time Sampled: 14:00 3 in Air Content: 5.0 % Unit Weight: N/A 900 F Ambient Temperature: 980 F Yardage (c.y.): 5/5 Storm Drain Inlet - West Sandy Lake, south side curb eastbound lane, Station 1 +50 Sample Location: Same as above Concrete Compression Test Results Cylinder Age Max Load Area Stren}th Fracture Set # # Test Date (days) (Ibs. force) (sq.in.) (psi Type 01 SLR08180601 08/25/2006 7 98624 27.99 r!:: E-columnar 01 SLR08180602 09/15/2006 28 126080 28.18 4470 C-cone/shear 01 SLR08180603 09/15/2006 28 122970 28.18 C-cone/shear 01 SLR08180604 Hold 28 day average 4420 Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C17 CMJ Engineering, I h jtJ-/ o gallons of water added on site **REVISED REPORT 9/12/2006** Strength specification changed from 3000 to 3600 Concrete temperature specification removed Ambient temperature specification revised to remove maximum temperature. fj.tt~~ R. Carl Lee, SET. Vice PresidenVCMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, it s, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Page 1 of 1