Loading...
ST9902-LR060921 Concr~ Compression Test Report eM J ENGINEERING, INC 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-123 Report Date: 09/21/2006 n/a 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method Test Data 08/17/2006 Zach Hartgraves HotlWindy Southern Star/9618-B ASTM C231 Strength Slump Air Content Concrete Temperature Ambient Temperature Specifications 3600 psi @ 28 Days 4 in max 3 % min 6 % max Ticket Number: Slump: Concrete Temperature: Placement Location: 1183461 Time Batched: 13:47 4 in Air Content: 5.0 % 990 F Ambient Temperature: 1060 F Storm Drain Inlet: Eastbound lane on southern curb side, Station 10+03.29 Time Sampled: 14:15 Unit Weight: N/A Yardage (c.y.): 5.5/5.5 Sample Location: 2 feet south and 4 feet east of existing paving Concrete Compression Test Results Cylinder Age Max Load Area Stren~th Fracture Set# # Test Date (days) (Ibs. force) (sq.in.) (psi Type 03 SLR08170609 08/24/2006 7 120440 28.18 ~70 C-cone/shear 03 SLR08170610 09/14/2006 28 137640 27.99 20 E-columnar 03 SLR08170611 09/14/2006 28 141070 27.99 5040 E-columnar 03 SLR08170612 Hold 28 day average 4980 Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, o gallons of water added on site **REVISED REPORT 9/12/2006** Strength specification changed from 3000 to 3600 Concrete temperature specification removed Ambient temperature specification revised to remove maximum temperature. R. Carl Lee, S.E.T. Vice PresidenVCMT Manager ,C 38, C143, C172, C1064, and C617 or C1231. CMJ Engineering, Inc LIMITATIONS: The test results presented in this report apply only to the specific samples, items, a. d areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Page 1 of 1