Loading...
ST9902-LR060918 eM J ENGINEERING, INC 7636 Pebble Drive Fort Worth, Texas 76118 Tel. (817) 284-9400 Fax: (817) 589-9993 Concrete Compression Test Report Client: Project: City of Coppell West Sandy Lajs.e'Road ReconstructiQ1'l ~. /l h t~!V r .t:;-K ) /J ~~ ilL Report Distribution CMJ Report No.. 687-5192-121 Report Date: 11/01/2006 1/- t~ (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins Strength Slump Air Content Concrete Temperature Ambient Temperature Specifications 3600 psi @ 28 Days 5 in max 3 % min 6 % max n/a Test Data 08/15/2006 Zach Hartgraves ClearlWindy LMC/1851 ASTM C231 - - 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method Ticket Number' Slump Concrete Temperature Placement Location 7169346 Time Batched 14'08 Time Sampled: 15.30 Unit Weight: N/A Yardage (c y). 20/30 35 in 900 F Air Content: 4.5 % Ambient Temperature 990 F Sandy Lake Road approach to Church Drive, eastbound lane Paving Sample Location. 10 feet west of east curb, 10 feet north of existing paving Concrete Compression Test Results Cylinder Age Max Load Area StrenfJth Fracture Set# # Test Date (days) (Ibs force) (sq.in.) (psi Type 02 SLR08150605 08/18/2006 3 108900 2809 3880 E-columnar 02 SLR08150606 08/18/2006 3 107320 2809 3820 E-columnar 02 SLR08150607 08/22/2006 7 116940 27.81 4210 C-cone/shear 02 SLR08150608 09/12/2006 28 151420 2818 5370 E-columnar 02 SLR08150609 09/12/2006 28 153580 2818 5450 C-cone/shear 02 SLR08150610 Hold 28 day average 5410 Normal cylinder size. 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064. and C617 or C1231 o gallons of water added on site **REVISED REPORT 9/12/2006** Concrete temperature specification removed Ambient temperature specification revised to remove maximum temperature **REVISED REPORT 9/18/2006** Slump specification changed from 4" Max to 5" Max CMJ Engineering, nc R. Carl Lee, SET Vice President/CMT Manager LIMITATIONS The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Page] of 1 Concrete Compression Test Report eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-121 Report Date: 09/18/2006 ** REVISED REPORT ** (SEE COMMENTS BELOW) Strength Slump Air Content Concrete Temperature Ambient Temperature Specifications 3600 psi @ 28 Days 5 in max Test Data 3 % min 6 % max n/a 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method 08/15/2006 Zach Hartgraves Clear/Windy LMC/1851 ASTM C231 Ticket Number: Slump: Concrete Temperature: Placement Location: 7169346 Time Batched: 14:08 Time Sampled: 15:30 Unit Weight: N/A Yardage (c.y.): 20/30 3.5 in 900 F Paving: Air Content: 4.5 % Ambient Temperature: 990 F Sandy Lake Road approach to Church Drive, eastbound lane Sample Location: 10 feet west of east curb, 10 feet north of existing paving Concrete Compression Test Results Cylinder Age Max Load Area Set # # Test Date (days) (Ibs. force) (sq.in.) 02 SLR08150605 08/18/2006 3 108900 28.09 02 SLR08150606 08/18/2006 3 107320 28.09 02 SLR08150607 08/22/2006 7 116940 27.81 02 SLR08150608 09/12/2006 28 02 SLR08150609 09/12/2006 28 02 SLR08150610 Hold Stren,gth (pSI) 3880 3820 4210 Fracture Type E-columnar E-columnar C-cone/shear Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138. C143, C172, C1064, and C617 or C1231. o gallons of water added on site **REVISED REPORT 9/12/2006** Concrete temperature specification removed. Ambient temperature specification revised to remove maximum temperature. **REVISED REPORT 9/18/2006** Slump specification changed from 4" Max to 5" Max CMJ Engineering, Inc R. Carl Lee, S.E.T. Vice President/CMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, item. and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are p oduced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Page 2 of 1