Loading...
ST9902-LR060915 Concrr~ Compression Test Report eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687 -5192-118 Report Date: 09/15/2006 Specifications Test Data Strength Slump Air Content Concrete Temperature Ambient Temperature 3600 psi @ 28 Days 4 in max 3 % min 6 % max n/a 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method 08/11/2006 Brent Talcott Clear/Light Breeze Southern Star/9618-B ASTM C231 Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: 1183397 Time Batched: 12:55 4 in Air Content: 3.2 % 990 F Ambient Temperature: 1000 F Inlet: Sandy Lake Road, Eastbound Side, Sta. 0+66.08, C1-8 Time Sampled: 13:40 Unit Weight: n/a Yardage (c.y.): 4 of 4 Same Concrete Compression Test Results Cylinder Age Max Load Area Stren}th Fracture Set# # Test Date (days) (Ibs. force) (sq.in.) (psi Type 03 SLR08110609 08/18/2006 7 116120 28.09 4130 B-cone/split 03 SLR08110610 09/08/2006 28 147880 27.71 5340 E-columnar 03 SLR08110611 09/08/2006 28 146720 27.71 5290 E-columnar 03 SLR08110612 Hold 28 day average 5320 Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1 064, and C617 or C1231. o Gallons of Water Added On-Site **REVISED REPORT 9/12/2006** Strength specification changed from 3000 to 3600 Concrete temperature specification removed Ambient temperature specification revised to remove maximum temperature. CMJ Engineerin , I R. Carl Lee, S.E.T. Vice President/CMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Page 1 of 1