Loading...
ST9902-LR060810 (2) In-Place Soil Moisture/Density Tests by Nuclear Method eM J ENGINEERING, INC 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: City of Coppell Project: West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-107 Report Date: 08/10/2006 Specifications Test Data Percent Compaction: +95% min Moisture Content: opt -2% to +4% Date Tested: 08/04/2006 Technician: Jory Goldring 2682 ASTM 0-698 Material Description Lime Treated Light Brown Sandy Clay Optimum Maximum Dry Moisture % Density pet Curve No. Test Method 16.0 99.5 In-Place Test Results Test Elevation Ref. Probe No or Lift Location Curve Depth Lime Paving Subgrade 248.1 Final ROYAL LANE - SOUTHBOUND: 2682 6" Retest of #248.0, Report #687-5192-096 Percent Moisture Wet Density Dry Density (pef) (pet) Percent Density 19.4 113.2 94.8 95.3 Test results on this reporl meet project specification. Test Method(s): ASTM D2922, ASTM D3017 Additional Remark(s): Retest of Report #687-5192-096; Date Tested: 7/31/2006 Gauge: CPN Gauge SN: 6660 CMJ Engineering, Inc \ LIMITATIONS: The test results presented in this report apply only to the specific samples, items, a areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 07 Page 1 of I