ST9902-LR060801
Daily Report of In-Field Sieve Analysis
__ eMJ ENGINEERING, INe.
7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993
Client:
Project:
City of Coppell
West Sandy Lake Road
Reconstruction
Report Distribution: City of Coppell (2)
Tiseo Paving Company
Teague Nail & Perkins
CMJ Report No.:
Date Tested:
Technician:
687 -5192-099
August 1, 2006
Phil Sommerville
Test
No.
1
2
3
4
5
In-Field Sieve Anal sis of Road Mixed Materials
lEX 101E
Percent
Passing
1-3/4" Sieve
Test Location
(Paving Subgrade)
Sand Lake Road - Eastbound Lane
Sta. 30+50, 8' South of Centerline
Sta. 34+50, 12' North of Centerline
Sta. 37+00, 10' South of Centerline
Sta. 39+55 on Centerline
Sta. 41 +40, 20' North of Centerline
100%
100%
100%
100%
100%
100%
Percent
Passing
#4 Sieve
76.0%
77.7%
72.7%
60.2%
63.0%
60%
CMJ Engineering, Inc.
The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test
results do not pertain to any other samples, items, or areas regardless of similarity. Our reports are produced solely for the
exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client
and CMJ Engineering, Inc.