Loading...
ST9902-LR060731 Daily Report of In-Field Sieve Analysis __ eMJ ENGINEERING, INe. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Cappel! West Sandy Lake Road Reconstruction Report Distribution: City of Coppell (2) Tiseo Paving Company Teague Nail & Perkins CMJ Report No.: Date Tested: Technician: 687-5192-097 July 31,2006 Phil Sommerville Test No. 1 2 3 4 5 In-Field Sieve Anal sis of Road Mixed Materials Test Location (Paving Subgrade) West Sand Lake Road - Eastbound Lane Sta. 19+00 on Centerline Sta. 21 +00, 10' South of Centerline Sta. 23+00, 10' North of Centerline Sta. 25+15 on Centerline Sta. 28+50, 8' North of Centerline TEX 101E Percent Passing 1-3/4" Sieve 100% 100% 100% 100% 100% 100% Percent Passing #4 Sieve 74.9% 69.5% 78.7% 79.4% 73.2% 60.0% I CMJ Engineering, In . . R. Carl Lee, S.E.T. Vice President/CMT Manager The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items, or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc.