ST9902-LR060729
Daily Report of In-Field Sieve Analysis
-e eM} ENGINEERING, INe.
7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993
Client:
Project:
City of Coppell
West Sandy Lake Road
Reconstruction
Report Distribution: City of Coppell (2)
Tiseo Paving Company
Teague Nail & Perkins
CMJ Report No.:
Date Tested:
Technician:
687 -5192-094
July 29, 2006
Jory Goldring
Test
No.
1
2
3
In-Field Sieve Anal sis of Road Mixed Materials
Test Location
(Paving Subgrade)
Sand lake Road - Eastbound lane
Sta. 12+96, Centerline
Sta. 14+75, Ri ht
Sta. 17+00, Left
TEX 101E
Percent
Passing
1-3/4" Sieve
Percent
Passing
#4 Sieve
100%
100%
100%
70%
67%
69%
100%
60%
CMJ Engineering, Inc.
R. Carl Lee, S.E.T.
Vice President/CMT Manager
The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test
results do not pertain to any other samples, items, or areas regardless of similarity. Our reports are produced solely for the
exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client
and CMJ Engineering, Inc.