Loading...
ST9902-LR060728 Daily Report of In-Field Sieve Analysis ~ eMJ ENGINEERING, 1Ne. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: City of Coppell (2) Tiseo Paving Company Teague Nail & Perkins CMJ Report No.: Date Tested: Technician: 687-5192-092 July 28, 2006 Travis Powell Test No. Test Location (Paving Subgrade) TEX 101E Percent Passing 1-3/4" Sieve Percent Passing #4 Sieve In-Field Sieve Anal sis of Road Mixed Materials 1 2 3 4 Sand Lake Road Sta.6+00 Sta. 7+50 Sta. 9+00 Sta. 10+50 100% 100% 100% 100% 74% 73% 66% 69% 100% 60% CMJ Engineering, Inc. R. Carl Lee, S.E.T. ice President/CMT Manager The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items, or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc.