Loading...
ST9902-LR060726 Daily Report of In-Field Sieve Analysis __ eMJ ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: City of Coppell (2) Tiseo Paving Company Teague Nail & Perkins 687-5192 -085 July 26, 2006 Richard Jones CMJ Report No.: Date Tested: Technician: Revised Report 8/7/06: "Project" Specification Test No. 1 2 3 4 5 In-Field Sieve Anal sis of Road Mixed Materials TEX 101E Percent Passing 1-3/4" Sieve Percent Passing #4 Sieve Test Location (Paving Subgrade) Southbound - Ro al Lane Sta. 6+50, Centerline Sta. 8+00, Centerline Sta. 9+50, Centerline Sta. 11 +50, Centerline Sta. 13+00, Centerline 100% 100% 100% 100% 100% 68% 70% 76% 69% 70% 100% 60% CMJ Engineering, Inc. R. Carl Lee, S.E.T. Vice PresidentlCMT Manager The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items, or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc.