ST9902-LR060722
Daily Report of In-Field Sieve Analysis
eM] ENGINEERING, INC.
7636 Pebble Drive Fort Worth, Texas 7611 B Tel: (817) 284-9400 Fax: (817) 589-9993
Client:
Project:
City of Coppell
West Sandy Lake Road
Reconstruction
Report Distribution: City of Coppell (2)
Tiseo Paving Company
Teague Nail & Perkins
CMJ Report No.:
Date Tested:
Technician:
687-5192-081
July 22, 2006
Richard Jones
In-Field Sieve Anal sis of Road Mixed Materials
TEX 101E
Percent
Passing
1-3/4" Sieve
Percent
Passing
#4 Sieve
Test
No.
Test Location
(Paving Subgrade)
Cement Treated Soil -
Intersection of N. Co ell Dr. and Sand Lake Rd.
Sta. 53+30, 15' left of centerline
Retest of Test NO.1 above
100%
100%
67%*
81%
1
2
100%
80%
* Non-Compliant: Failure Retested with Passing Test Results on this Report
CMJ Engineering, Inc.
. Carl Lee, S.E.T.
Vice PresidentlCMT Manager
The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test
results do not pertain to any other samples, items, or areas regardless of similarity. Our reports are produced solely for the
exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client
and CMJ Engineering, Inc.