Loading...
ST9902-LR060722 Daily Report of In-Field Sieve Analysis eM] ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 7611 B Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: City of Coppell (2) Tiseo Paving Company Teague Nail & Perkins CMJ Report No.: Date Tested: Technician: 687-5192-081 July 22, 2006 Richard Jones In-Field Sieve Anal sis of Road Mixed Materials TEX 101E Percent Passing 1-3/4" Sieve Percent Passing #4 Sieve Test No. Test Location (Paving Subgrade) Cement Treated Soil - Intersection of N. Co ell Dr. and Sand Lake Rd. Sta. 53+30, 15' left of centerline Retest of Test NO.1 above 100% 100% 67%* 81% 1 2 100% 80% * Non-Compliant: Failure Retested with Passing Test Results on this Report CMJ Engineering, Inc. . Carl Lee, S.E.T. Vice PresidentlCMT Manager The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items, or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc.