Loading...
ST9902-LR060622 ~aily Activity Report eM} ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: City of Coppell (2) Tiseo Paving Company Teague Nail & Perkins CMJ Report No.: 687-5192-059 Date Tested: June 22, 2006 Technician: Robert McElvany On this date, the above technician, representing CMJ Engineering, arrived on-site as scheduled at the above referenced project to test concrete on an inlet/junction box located at the intersection of Oakbend and West Sandy Lake Road. Upon arrival, CMJ was informed by Kyle with Better Inlets that the area was not ready for concrete to be placed. CMJ's technician notified our dispatcher, who in turn called John Gay with Tiseo to verify that the previously scheduled concrete placement was not to occur on this date. John informed CMJ that he had spoken with Larry Davis at noon on this date to inform him that the area was not ready for concrete placement at the scheduled time and to call and cancel. CMJ never received notification of this cancellation. CMJ Engineering, Inc. R. Carl Lee, S.E.T. Materials Testing Manager The test results presented in this report apply only to the specific sam es, items, and areas described within this report. The test results do not pertain to any other samples, items, or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc.