Loading...
ST9902-LR060620 - In-Place Soil Moisture/Dens:.ity Tests by Nuclear Method eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-056 Report Date: 06/20/2006 Specifications Percent Compaction: +95% min +100% max Moisture Content: opt +0% to +5% Test Data Date Tested: 06/14/2006 Technician: Jory Goldring ASTM D-698 Material Description Tan and Dark Brown Silty Clay Optimum Maximum Dry Moisture % Density pcf Curve No. Test Method 2208 21.0 100.5 In-Place Test Results Probe Percent Wet Density Dry Density Percent Depth Moisture (pet) (pet) Density 6" 22.6 121.7 99.3 ~ 6" 23.5 119.8 97.0 96.5 6" 21.7 120.6 99.1 98.6 6" 22.3 120.7 98.7 98.2 Test No Elevation or Lift Location Ref. Curve 197.0 198.0 199.0 200.0 -4' BFG -3' BFG -1' BFG Final Roadway Embankment Coppell Rd. 60' North of Sandy Lake Road, Centerline 2208 70' North of Sandy Lake Road, Centerline 2208 100' North of Sandy Lake Road, Centerline 2208 110' North of Sandy Lake Road, Centerline 2208 ADDITIONAL REMARK(s): {BFG} Below Final Grade Test results on this report meet project specification. Test Method(s): ASTM D2922, ASTM D3017 Gauge: CPN Gauge SN: 6660 CMJ Engineering, In LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 07 Page 1 of 1