Loading...
ST9902-LR060615 (2) - In-Place Soil Moisture/Den~y Tests by Nuclear Method eM J ENGINEERING, INC 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-054 Report Date: 06/15/2006 Specifications Test Data Percent Compaction: +95% min +100% max Moisture Content: opt +0% to +5% Date Tested: 06/12/2006 Technician: Richard Jones 2208 2207 ASTM D-698 ASTM D-698 Material Description Tan and Dark Brown Silty Clay Dark Brown Clay Optimum Maximum Dry Moisture % Density pet 21.0 100.5 22.0 99.0 Curve No. Test Method In-Place Test Results Test No Elevation or Lift Location Ref. Probe Percent Wet Density Dry Density Percent Curve Depth Moisture (pet) (pet) D 'ty 2208 6" 21.6 117.1 96.3 95.8 2207 6" 22.7 119.4 97.3 98.3 2207 6" 22.2 117.2 95.9 96.9 188.0 189.0 190.0 2nd Lift 2nd Lift 2nd Lift Roadway Embankment Fill ** Centerline, Sta. 3+25 Centerline, Sta. 2+50 Centerline, Sta. 1+50 Test results on this report meet project specification. Test Method(s): ASTM D2922, ASTM D3017 ADDITIONAL REMARK(s): ** Roadway Embankment Fill, NORTH COPPELL DRIVE Gauge: Troxler Gauge SN: 5381 Std. Density Count: 17 CMJ Engineering, I c LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 07 Page 1 of 1