Loading...
ST9902-LR061027 Concrete Compression Test Report eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Specifications Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins Client: Project: City of Coppell West Sandy Lake Road Reconstruction CMJ Report No.: 687-5192-161 Report Date: 11/17/2006 Test Data Strength Slump Air Content Concrete Temperature Ambient Temperature 3600 psi @ 28 Days tJ 5 in max ~ I J 3 % min 6 % max I t 411 1'1 n/a 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method 1 0/17/2006 Jonathan Hubbard Clear/Calm Redi Mix/732 ASTM C231 Ticket Number: Slump: Concrete Temperature: Placement Location: 178178 Time Batched: 11 :00 Time Sampled: 12:15 4.25 in Air Content: 4.1 % Unit Weight: N/A 840 F Ambient Temperature: 730 F Yardage (c.y.): 5 of 10 Paving with Decorative Stamp at Sandy Lake Rd. and North Coppell on North half of Intersection Sample Location: Paving with Decorative Stamp at Sandy Lake Rd. and North Coppell on North half of Intersection Concrete Compression Test Results Cylinder Age Max Load Area Stren8th Fracture Set# # Test Date (days) (Ibs. force) (sq.in.) (pSI Type 01 SLR10170601 1 0/24/2006 7 112840 27.99 4030 C-cone/shear 01 SLR10170602 11/14/2006 28 140020 28.09 4980 E-columnar 01 SLR10170603 11/14/2006 28 142200 28.09 ~ E-columnar 01 SLR10170604 Hold 28 day average 5020 Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. o Gallons of Water Added On-Site LIMITATIONS: The test results presented in this report apply only to the specific samp ,items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Pagelofl R. Carl Lee, S.E.T. Vice PresidentlCMT Manager Concrete Compression Test Report eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1 ) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-161 Report Date: 10/27/2006 Strength Slump Air Content Concrete Temperature Ambient Temperature Specifications Test Data 3600 psi @ 28 Days 5 in max 3 % min 6 % max n/a 400 F min Placement Date Sampled By Weather Supplier/Mix Air Content Method 10/17/2006 Jonathan Hubbard Clear/Calm Redi Mix/732 ASTM C231 Ticket Number: Slump: Concrete Temperature: Placement Location: Sample Location: 178178 Time Batched: 11:00 TimeSampled: 12:15 4.25 in Air Content: 4.1 % Unit Weight: N/A 840 F Ambient Temperature: 730 F Yardage (c.y.): 5 of 10 Paving with Decorative Stamp at Sandy Lake Rd. and North Coppell on North half of Intersection Paving with Decorative Stamp at Sandy Lake Rd. and North Coppell on North half of Intersection Concrete Compression Test Results Cylinder -fl Max Load Area D Fracture Set# # Test Date (d (Ibs. force) (sq.in.) Type 01 SLR10170601 10/24/2006 112840 27.99 403 C-cone/shear 01 SLR10170602 11/14/2006 8 01 SLR10170603 11/14/2006 28 01 SLR10170604 Hold Normal cylinder size: 6" x 12" Field and laboratory tests by CMJ are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. fZJ Gallons of Water Added On-Site /I)d (p CMJ Engineering, Inc , .. f\t~ R. Carl Lee, S.E.T. Vice PresidentlCMT Manager LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 01 Page I of I