Loading...
ST9902-LR060601 - In-Place Soil Moisture/Deno.tt:y Tests by Nuclear Method eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: City of Coppell Project: West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-041 Report Date: 06/01/2006 ~pecifications Percent Compaction: +95% min +100% max Moisture Content: opt +0% to +5% Test Data Date Tested: OS/24/2006 Technician: Jory Goldring Curve No. Test Method Material Description Optimum Maximum Dry Moisture % Density pcf 2207 ASTM D-698 Dark Brown Clay 22.0 99.0 In-Place Test Results Wet Density (pet) Percent Density Test No Elevation or Lift Location Ref. Curve Probe Depth Percent Moisture 170.0 171.0 172.0 2nd Lift 2nd Lift 2nd Lift Roadway Embankment- Fill Area 150' South of Sandy Lake Rd., Royal Ln. 300' South of Sandy Lake Rd., Royal Ln. 450' South of Sandy Lake Rd., Royal Ln. 2207 2207 2207 6" 6" 24.3 24.6 22.4 122.2 120.5 120.6 98.3 96.7 98.5 99.3 97.7 99.5 6" Test results on this report meet project specification. Test Method(s): ASTM D2922, ASTM D3017 Gauge: CPN Gauge SN: 6660 Std. Density Count: 60015 CMJ Engineering, Inc LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. O? Page 1 of 1