Loading...
ST9902-LR060519 -~n-Place Soil Moisture/Dens"" Tests by Nuclear Method eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: City of Coppell ~ Report Distribution: Project: West Sandy Lake RO~ Reconstruction (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-036 Report Date: 05/19/2006 Specifications Test Data Percent Compaction: +95% min +100% max Moisture Content: opt +0% to +5% Date Tested: 05/16/2006 Technician: Joshua Davis 2276 2351 2208 Test Method ASTM D-698 ASTM D-698 ASTM D-698 Material Description Reddish Brown, Tan and Gray mottled Sandy Clay Orange Brown Clayey Sand w/Cement Tan and Dark Brown Silty Clay Optimum Maximum Dry Moisture % Density pet 14.0 115.0 11.5 108.0 21.0 100.5 Curve No. In-Place Test Results Test Elevation Ref. Probe Percent Wet Density Dry Density Percent No or Lift Location Curve Depth Moisture (pet) (pet) Density Trench Backfill 118.1 Final Retest of #118.0, Report #687-5192-030 2208 6" 24.3 121.3 97.6 139.0 -4.0' BFG Sta. 10.68, SD 'C-1' 2276 6" 16.7 127.2 109.0 140.0 -3.0' BFG Sta. 10.68, SD 'C-1' 2276 6" 17.2 121.2 103.4 141.0 -2.0' BFG Sta. 10.68, SD 'C-1' 2276 6" 18.2 120.4 101.9 142.0 -1.0'BFG Sta. 10.68, SD 'C-1' 2276 6" 16.7 122.5 105.0 ADDITIONAL REMARK(s): * Non-Compliant: Contractor Notified Retest of Report #687-5192-030; Date Tested: 4/19/2006 {BFG} Below Final Grade {SD} Storm Drain An asterisk (') appears next to test results which do NOT meet the project specifications. Test Method(s): ASTM D2922, ASTM D3017 Gauge: Humboldt Gauge SN: 5000 Std. 'i,ti;~~ CMJ Engineering, LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 07 Page 1 of 1