Loading...
ST9902-LR060418 - In-Place Soil Moisture/Den~y Tests by Nuclear Method eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-024 Report Date: 04/18/2006 Specifications Percent Compaction: +95% min +100% max Moisture Content: opt +0% to +5% Test Data Date Tested: 04/12/2006 Technician: Joshua Davis Curve No. Test Method Material Description Optimum Maximum Dry Moisture % Density pcf 2208 ASTM D-698 Tan and Dark Brown Silty Clay 21.0 100.5 In-Place Test Results Test No Elevation or Lift Location Ref. Probe Percent Wet Density Dry Density Curve Depth Moisture (pet) (pet) 2208 6" 23.1 122.4 99.4 2208 6" 23.2 121.4 98.5 2208 6" 23.6 118.2 95.6 103.0 104.0 105.0 Final -1.0' BFG Final Roadway Embankment SSL Sta. 6+61 Sta. 7+00 Sta.7+00 {BFG} Below Final Grade {SSL} Storm Sewer Line 'A-1' & 'A-2' Test results on this report meet project specification. Test Method(s): ASTM D2922, ASTM D3017 f/IQ/ 'i Gauge: Humboldt Gauge SN: 5000 Std. Density Count: CMJ Engineering, I c LIMITATIONS: The test results presented in this report apply only to the specific samples, item, an areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are pro d solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 07 Page 1 of 1